28
Treadwall Kore Pro Owner’s Manual—2017
Assembly Instrucons
Before Assembly:
The most important first step is to consider carefully the locaon and posion of your
Treadwall. A locaon that is too visible
- for example in the direct focus of members using CV
equipment or walking in the entrance -
may discourage people from climbing. Oen simply
rotang the Treadwall slightly will dramacally improve its usage.
The ground should be flat and level and the area directly around the Treadwall should be clear
of any hazards for the climber or trainer. The Treadwall fits well in the cardio area of a gym.
Tools required and set up:
In addion to the tool list you will need a helper and two ladders. If you are ght on space
begin by assembling the frame work and then bring in the side channels and shroud and place
them directly onto the machine.
Assembly will take 6-
8 hours, please read the enre assembly procedure prior to starng the
install. If you do have quesons please contact us at 1
-800-707-9616.
WRENCHES:
1 - 9/16 open end wrench
1 – ¾ open end wrench
1 – small 3/8” sockets for
panels
1 – 9/16 socket
1 – ¾ socket
1 – socket wrench
1 – Allen set, SAE
1 – crescent or universal
wrench
SCREWDRIVERS:
1 – Set of screwdrivers
1 – Cordless drill or screw-
driver
2 – Phillips driver bits for
drill
PLIERS:
1 – vice grip
1 – needle nose pliers
1 – wiring pliers (good for
working with master links on
chains)
Summary of Contents for Treadwall Kore Pro
Page 2: ......
Page 9: ...10 Treadwall Kore Pro Owner s Manual 2017 ...
Page 18: ...26 Treadwall Kore Pro Owner s Manual 2017 ...
Page 37: ......