38
Treadwall Kore Pro Owner’s Manual—2017
Main Channel Assembly
Main Channel Assembly
Remove the cover at the top of the right channel.
The hydraulic pump is mounted in slots so it can slide up and
down. Make sure it is as high as it can be.
Install the drive chain between the pump sprocket and the main
sha) as shown. A master
-link is provided to connect the chain.
Once the chain is a7ached, lower the pump to take up the slack.
There is a long push-down bolt above the pump. Adjust it down
far enough to take out the slack in the chain, but don't make it
too ght. Too much tension will make the Treadwall run
sluggishly.
Pushdown Bolt
To disassemble the master-links use a pair of pliers or a flat
blade screw driver to press and slide the retaining clip along the
side plate in the direc on opposite the open end of the retainer
clip.
To install the Master-links assemble them as shown in the
diagram below. The retaining clip must fit into the small grooves
on the master-link. Then, press and slide the retaining clip into
posi on towards the open end of the retaining clip.
When correctly installed the retaining clip is solidly in the
grooves of the master-link laying flat against the side plate.
The same style master-link is used on the drive and main chains.
Summary of Contents for Treadwall Kore Pro
Page 2: ......
Page 9: ...10 Treadwall Kore Pro Owner s Manual 2017 ...
Page 18: ...26 Treadwall Kore Pro Owner s Manual 2017 ...
Page 37: ......