29
Treadwall®FT Owner’s Manual—2019
Rev Aug 2019
Main Channel Assembly
The next steps involve lifting and installing the channels and their parts.
Start by mounting the channels: there is a right and left channel. The right channel has the
hydraulic box and speed lever. It is good to pad the top horizontal. The channels have a shaft
hole through which the end of the bearing shaft goes: this helps when mounting. Note: the right
channel will swing back due to the weight of the hydraulic box: make sure to hold it while
mounting. The left channel will tend to stay upright. Bag FT-20 has the bolts.
Right Channel bolts
Le Channel bolts
Pad horizontal to rest channels on
Sha hole to rest channel
on while inser ng bolts.
Summary of Contents for TREADWALL Max Frame
Page 2: ......