37
Treadwall®FT Owner’s Manual—2019
Rev Aug 2019
Main Chain Assembly & Rotating Wall
Each main chain side come in 2 parts.
Hang one section on the top shaft. Tabs
face out. Make sure the tabs are aligned
and synchronized on the sprocket by
carefully lining up the tabs side to side.
This will take a few minutes. If they are not
aligned, the panels will be crooked.
The chains have a short and long end (2
or 4 links at the end: it is best to have both
sides the same (same ends back).
Carefully rotate wall back towards vertical. By twisting the channels and
slipping the ends of the bottom shaft into one side then the other, the
bottom shaft can be placed inside the frame to its final location. This
takes two-three persons. When done, one person holds the channels.
The Max4 and S4
may
require the horizontal bolts be loosened slightly to
allow the frames to be spread (Leave the external X-Bracing hand tight).
If this is not enough, temporarily remove the spacer bar when lowering
the channels.
Bottom shaft will end up
inside frame area. By
swinging wall side to
side, the shaft end can
be maneuvered into the
space. It is tight. The 4
foot units can be hard-
er..
Top half of chains will
hang down.
Summary of Contents for TREADWALL Max Frame
Page 2: ......