— 28 —
"BRIG"
Board air chambers are hermetical if they keep own form during 8 hours. In this case:
– primary pressure has to be nominal;
– input valves openings have to be tightly closed by caps.
STORAGE BATTERY INSTALLATION.
In order to install the storage battery, perform next operations:
— open door of the stern compartment;
— install the storage battery into the battery container;
— connect the battery terminals with motor battery cord and
battery disconnector;
— please, check efficiency of the electric equipment.
Installed on a trailer (or on kell-blocks for storage) the boat should been laying on all surface of the Main loading area (keel line)
(see Fig. D11).
It is possible to install the boat on several reference points. Thereby the point of support (1) mus t be an obligatory, and the point
of support (2), (3), (4) must be an additional.
Lateral roller supports can be used only with a view of prevention from tipping.
BOAT TRANSPORTATION BY TRAILER.
Before installation your storage battery
read the BATTERY MANUAL carefully
and ensure that you have understood all
the described procedures.