12
Assembly
C
A
B
D
Figure 15. Install Upper Tube to Cover
A. Upper Tube
B. Cover
C. Ridge, Upper Tube
D. Ridge Cutout
C
D
A
B
E
Figure 16. Install Middle Tube
A. Lower Chute
B. Strap, Rubber
C. Pin
D. Middle Tube
E. Upper Tube
F. Screw, 1/4 x 3/4
44” Frame Hung Mowers
50” Frame Hung Mowers
44” Free Floating Mowers
50” Free Floating Mowers
F
INSTALLING UPPER & MIDDLE TUBES
1. Slide the upper tube (E, Figure 15) into cover (B)
aligning ridge (C) with cutout (D) as shown.
2. See Figure 16 for correct hole location and secure
the upper tube (E) to middle tube using screw (F).
2. Slide middle tube (D, Figure 16) into upper tube
(E).
3. Slide middle tube (D) over boot (A). Pull strap (B)
and place hole completely over pin (C).
Summary of Contents for 1695354
Page 6: ...4 Safety ...
Page 15: ...13 Assembly ...