8
Assembly
WARNING
Before beginning any service work turn off the PTO, set
the parking brake, turn off the ignition, and disconnect
the spark plug wire(s).
Ba
ffl
e Installation
NOTE:
For ease of baffle installation, mower should
be at highest setting. See Tractor Operator Manual for
instructions.
For 46” Mower Decks
1. Lift side discharge chute (
*
, Figure 1).
2. Insert baffle (
AA
) through discharge opening and
position inside deck.
3. Using hole closest to discharge opening, insert carriage
bolt (
A
) through hole in baffle, spacer (
N
) and mower.
Secure with nut (
H
).
4. Using hole near the center of mower deck, insert
carriage bolt (
B
) through hole in baffle, and mower
deck. Secure with nut (
H
).
*
AA
A
N
H
H
B
Figure 1
For 52” Mower Decks
1. Lift side discharge chute (
*
, Figure 2).
2. Insert baffle (
AB
) through discharge opening and
position inside deck.
3. Using hole closest to discharge opening, insert carriage
bolt (
C
) through hole in baffle, spacer (
O
) and mower.
Secure with nut (
H
).
4. Using hole near the center of mower deck, insert
carriage bolt (
B
) through hole in baffle, and mower
deck. Secure with (
H
).
*
AB
C
O
H
H
B
Figure 2
No
t fo
r
Rep
rod
uct
ion