7K116
1.
Attaching toTractor
1. Top Float Link -
•
Be sure to position the top
float link as shown in
figures 11 & 12.
•
Use a pin or pin and bushing
at the top float link.
•
The top link should be secured
if the machine is being transported
a great distance; it shoud be free
to float while seeding.
FLOAT LINK
Category I & II
Category I & II
Category I & II
Quick Coupler
18 7/32”
14 31/32”
FLOAT LINK
Category I & II
Quick Coupler
Figure 12
Position of Float Link
Allow Link to float
while seeding
CLEVIS PIN
BUSHING
Figure 11
FRONT
of Machine
FRONT
of Machine
OPERATION
Page 17
900rev601