Laser precautions
DANGER
All fiber-optic interfaces use Class 1 lasers.
DANGER
Use only optical transceivers that are qualified by Brocade Communications Systems LLC and comply with the FDA
Class 1 radiation performance requirements defined in 21 CFR Subchapter I, and with IEC 60825 and EN60825. Optical
products that do not comply with these standards might emit light that is hazardous to the eyes.
Facility requirements
Before installing the device, be sure the following facilities requirements are met.
TABLE 7
Facility requirements
Type
Requirements
Electrical
•
Adequate supply circuit, line fusing, and wire size, as specified by the electrical rating on the switch nameplate
•
Circuit protected by a circuit breaker and grounded in accordance with local electrical codes
Refer to the Technical Specifications at the end of this guide for complete power supply specifications.
Thermal
•
A minimum airflow of 79.8 cubic meters/hour (47 cubic ft/min.) available in the immediate vicinity of the
switch
NOTE
Although this airflow may exceed the airflow maximum listed in the device Technical
Specifications, the additional airflow is recommended to pressurize the inlet (cool isle) side of rack
installations relative to the exhaust side to minimize recirculation of hot air back to the inlet side.
•
Ambient air temperature not exceeding 40°C (104°F) while the switch is operating
Rack (when rack-mounted)
•
Two rack unit (2U) in a 48.3 cm (19-inch) rack
•
All equipment in the rack grounded through a reliable branch circuit connection
•
Additional weight of switch not to exceed the rack’s weight limits
•
Rack secured to ensure stability in case of unexpected movement
Quick installation checklist
This checklist provides a high-level overview of the basic installation process from the planning stage to the point where the device
comes online and is ready to be deployed. Completing all the tasks in the suggested order ensures successful installation. Brocade
recommends that you print this checklist and take it to the installation site.
Pre-installation tasks
Review all installation requirements ahead of time as part of your site preparation. Careful planning and site preparation ensures seamless
installation, especially when installing multiple devices.
Facility requirements
Brocade G630 Hardware Installation Guide
18
53-1005235-02
Summary of Contents for Brocade G630
Page 10: ...Brocade G630 Hardware Installation Guide 10 53 1005235 02 ...
Page 22: ...Brocade G630 Hardware Installation Guide 22 53 1005235 02 ...
Page 48: ...Brocade G630 Hardware Installation Guide 48 53 1005235 02 ...
Page 72: ...Brocade G630 Hardware Installation Guide 72 53 1005235 02 ...
Page 88: ...Brocade G630 Hardware Installation Guide 88 53 1005235 02 ...
Page 96: ...Brocade G630 Hardware Installation Guide 96 53 1005235 02 ...
Page 100: ...Brocade G630 Hardware Installation Guide 100 53 1005235 02 ...