G730-Install-IG100 Installation Guide
Brocade
®
G730 Switch Hardware Installation Guide
Figure 2: Port Numbering for the Brocade G730 Switch
Nonport-Side View of the Device
The following figure shows the nonport-side view of the Brocade G730 Switch.
Figure 3: Nonport-Side View with AC Power Supply and Fan Assembly Units
1. Power Supply Units (PSU 1 and PSU 2 from right to left)
2. Fan Assemblies (Fan 1, 2, and 3 from right to left)
3. Ground Cable Connector
Device Management Options
You can use the management functions built into the device to monitor the fabric topology, port status, physical status, and
other information. This functionality helps you analyze switch performance and accelerate system debugging. The device
automatically performs a power-on self-test (POST) each time it is turned on. A RASlog message is generated for any
detected startup errors.
You can manage the device using any of the management options that are listed in the following table.
G730-Install-IG100
10
Summary of Contents for Brocade G730
Page 94: ......