Remeha Gas 350
12
fig. 07
Optional basic signalling print
4A-1
4A-2
D1
K8
4A-9
D7
K9
K10
4A-8
4A-7
4
5
K10-1
6
7
K9-1
2
K8-1
3
1
K8-2
CON.4A
B
m
B
m
C
al
1
2
3
4
5
6
7
General warning
Operating signal
Operating signal
stage 2
stage 1
signal
K7
K6
K5
K4
K3
K2
K1
4A-1
4A-6
4A-5
4A-4
4A-10
4A-3
4A-2
D6
D5
D4
D3
D2
D1
K8
4A-9
D7
K9
K10
4A-8
4A-7
4
5
K10-1
6
7
K9-1
8
9
K7-1
20 21
K1-1
18 19
K2-1
16 17
K3-1
14 15
K4-1
12 13
K5-1
10 11
K6-1
2
K8-1
3
1
K8-2
CON.4A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
High limit stat
Low water level
Water level
Down draught
Valve leakage
Operating signal
Operating signal
General warning
No power supply
control
thermostat
failure
Burner
failure
stage 2
stage 1
signal
fig. 08
Optional complex signalling print
10 COMMISSIONING
NOTE:
Commissioning must only be carried out by a
qualified engineer with the relevant training and certifica-
tion i.e. Acops - Corgi and a commissioning data sheet
/ log book completed and left on site for issue to the
owner.
Important:
commissioning for propane, first see par.
8.4
10.1 Commissioning the boiler
1. Check the gas connections.
2. Check the electrical supply (L/N and earth).
Warning
: control box is phase / neutral sensitive.
3. Check the water connections and whether the instal-
lation is full and under system pressure.
4. Switch on the circulation pump and check the rota-
tion direction.
5. Open the main gas cock (purge gas pipeline).
6. Switch on the electrical supply.
7. Set both the thermostats to about 85°C.
8. If a control system is built in: put the selector switch
on manual operation.
9. Switch on the boiler.
10. After a waiting time of about 3 seconds the ignition
starts. The magnetic valve MK opens and ignition
burner lights. At a minimum ionisation current of 3
µA the safety gas valve will open. The boiler runs.
11. Let the boiler run for a couple of minutes on high fire
to clear any air still in the gas pipe.
12. Set the correct
full load burner pressure
by means
of the pressure regulator on the gas multiblock gas
valve (
see
fig. 09, pos. a
).
Warning:
When the required burner pressure can
not be reached because of low inlet pressure,
ensure that the pressure regulator remains within it’s
operating range.
Now do the following:
•
Set the burner pressure to the highest possible
value (but not over the required full load burner
pressure).
•
Turn the pressure regulator anticlockwise until
the burner pressure is affected.
•
The burner pressure is now limited, this will
prevent the boiler from being over gassed
should the inlet gas pressure increase.
Summary of Contents for SEAGOLD 1A HR
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ...Atmospheric gas boiler 92 372 kW remeha Gas 3c Technical information ...
Page 98: ...1 remeha Gas 3c ECO Fully condensing atmospheric gas boiler 101 407 kW Technical information ...
Page 124: ...11 9 5 2 Complete instrument panel Fig 09 Wiring diagram for the complete instrument panel ...
Page 130: ...Remeha Gas 350 Atmospheric gas boiler 64 174 kW Technical information R e m e h a G a s 3 5 0 ...
Page 154: ...9 9 5 Wiring diagram boiler Fig 06 Wiring diagram ...
Page 172: ...15 9 7 Wiring diagrams Fig 08 Electrical principle diagram 04 05F SC 00001 ...
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ...1 Atmospheric gasboiler 276 1044 kW remeha Gas 5a 5a Duo Technical information ...
Page 227: ...12 remeha Gas 5a 5a Duo 8 4 Wiring diagram Fig 05 Wiring diagram ...
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......