7. ASSEMBLING AND INSTALLATION GUIDELINES
8.1 General
The gas train is fitted behind the front casing.
The local Gas authority should be consulted to ensure
that an adequate pressure and supply is available at the
boilers maximum output. To minimise risk of sediment or
foreign particles entering the control valves, an approved
filter may be fitted into the pipe work downstream.
The gas supply should be conform to the British Gas
safety regulations.
8.2 Gas pressure
Cat. I
2
H
Maximum gas pressure at inlet 100 mbar.
Burner pressure:
- full load : 14.0 mbar (100%)
- part load : 5.0 mbar (60%)
- injector size: 3.85 mm Ø
Note: LPG version on request.
8. GAS SUPPLY
9. ELECTRICAL SUPPLY
9.1 General
The electrical installation must conform to the IEE
regulations and also to local authority requirements.
9.2 Control panel
A control panel is fitted behind the front casing on the
same side as the water and gas connections.
9.3 Electrical connections
The boiler is pre-wired. Only the main supply should be
wired to the control panel.
9.4 Electrical data
Main supply
: 230 V-50Hz (L/N).
Running current : 155 VA.
Installed fuse
: 6 Amp.
7.4 Pocket for instrument panel
The thermostat pocket is fitted in the flow connection of
the boiler.
7.5 Water pressure
Each section is hydraulically tested to at least 10 bar.
Maximum test pressure for the assembled boiler block is
8 bar. Operating pressure between 0.8 bar and 6 bar.
Optional the boiler can be fitted with a water pressure
switch, set at 0.8 bar.
7.1 General
The boiler is suitable for operating at a maximum working
pressure of 6 bar and a minimum pressure of 0.8 bar.
Boiler can be installed in open or closed systems.
7.2 Boiler assembly
Broag can provide special tools on loan for the boiler
assembly with detailed building instructions. However, buil-
ding supervision and/or actual boiler erection ser vi ces
can be provided by Broag or an approved boiler erection
engineer.
7.3 Water connections
The boiler water connections (2
1
/
2
" BSP) are fitted at
the rear of the boiler (can be assembled either left or
right). The two end sections have a
3
/
4
" BSP tapping
with plug, one end section to accept a drain/off cock
(to be assembled on the same side as the gas/water
connections) and other end section to accept a plug.
Summary of Contents for SEAGOLD 1A HR
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ...Atmospheric gas boiler 92 372 kW remeha Gas 3c Technical information ...
Page 98: ...1 remeha Gas 3c ECO Fully condensing atmospheric gas boiler 101 407 kW Technical information ...
Page 124: ...11 9 5 2 Complete instrument panel Fig 09 Wiring diagram for the complete instrument panel ...
Page 130: ...Remeha Gas 350 Atmospheric gas boiler 64 174 kW Technical information R e m e h a G a s 3 5 0 ...
Page 154: ...9 9 5 Wiring diagram boiler Fig 06 Wiring diagram ...
Page 172: ...15 9 7 Wiring diagrams Fig 08 Electrical principle diagram 04 05F SC 00001 ...
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ...1 Atmospheric gasboiler 276 1044 kW remeha Gas 5a 5a Duo Technical information ...
Page 227: ...12 remeha Gas 5a 5a Duo 8 4 Wiring diagram Fig 05 Wiring diagram ...
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......