background image

Page 3

MODELS   350 • 350BK • 350BR • 355 • 355BK • 355BR

356 • 356BK • 356BR • 358

6.  Cut out the shingles inside of the circle.

7.  Replace template over guide hole and draw a 14-3/8" 

diameter circle on the black paper or roof boards using 
the smaller half of the template.

8.  Drill a large starting hole for the sabre saw just inside of 

the line.

9.  Cut out the roof board(s) inside of the line.

10.  For proper removal of roofing nails, draw a 22" square, 

centered around the hole. Remove nails holding shingles 
down from top two-thirds of square.

11.  Slide the flashing under the shingles. Start two-thirds 

of the way down from the top of the 22" square. Do not 
bend the shingles any more than necessary. Center the 
ventilator over the hole.

Summary of Contents for 350

Page 1: ... in locations readily accessible to people or animals 4 Fan is equipped with a thermostat which may start fan automati cally To reduce risk of injury or electric shock while servicing or cleaning unit switch power off at service panel and lock service panel to prevent power from being switched on accidentally When the service disconnecting means cannot be locked securely fasten a prominent warning...

Page 2: ...entilator top is level with the roof peak it can t be seen from the street Keep this approximate location in mind as you work from within the attic 2 Mark a spot halfway between rafters 3 Drill a guide hole through the roof at this mark 4 Cut out the template found on the carton 5 Push a large nail through the center of the cardboard template and into the guide hole Usingthelargehalfofthetemplate ...

Page 3: ...ate 8 Drill a large starting hole for the sabre saw just inside of the line 9 Cut out the roof board s inside of the line 10 For proper removal of roofing nails draw a 22 square centeredaroundthehole Removenailsholdingshingles down from top two thirds of square 11 Slide the flashing under the shingles Start two thirds of the way down from the top of the 22 square Do not bend the shingles any more ...

Page 4: ...356BR 358 Page 4 12 Carefully lift shingles and nail flashing securely to the roof using galvanized roofing nails 13 Using a good grade of roofing cement material seal all of the shingles and heads of nails DO NOT seal the bottom edge of the flashing ...

Page 5: ...N OFF SWITCH MOTOR VENTILATOR WIRING BOX MASTER ON OFF SWITCH BLK GRD WHT BLK GRD WHT THERMOSTAT BY PASS SWITCH RED BLACK This diagram shows how to wire a humidistat 3 Replace the metal cover plate over the thermostat wiring box and fasten securely 4 The thermostat setting determines the temperature at which the ventilator turns on The ventilator automatically turns off when the attic temperature ...

Page 6: ...1 2 3 Required 10 99170245 8B 18 x 3 8 Sheet Metal Screw 3 Required 11 98009756 Wiring Box Models 350 350BK 350BR 355 355BK 355BR 358 98009886 Wiring Box Models 356 356BK 356BR 12 99150471 Green Ground Screw 10 32 x 1 2 Hex Washer Head 13 99030144 Adjustable Thermostat 14 97005329 Lead Wire Assembly 15 16 990717160 Wiring Box Cover with Label Model 350 990717161 Wiring Box Cover with Label Model 3...

Page 7: ...Page 7 MODELS 350 350BK 350BR 355 355BK 355BR 356 356BK 356BR 358 SERVICE PARTS Replacement parts can now be ordered on our website Please visit us at www Broan com ...

Page 8: ...f any implied warranty is limited to the one year period as specified for the express warranty Some states do not allow limitation on how long an implied warranty lasts so the above limitation may not apply to you BROAN NUTONE S OBLIGATION TO REPAIR OR REPLACE AT BROAN NUTONE S OPTION SHALL BE THE PURCHASER S SOLE AND EXCLUSIVE REMEDY UNDER THIS WARRANTY BROAN NUTONE SHALL NOT BE LIABLE FOR INCIDE...

Reviews: