4 - POWER INPUT BOX
4-1
ACCESS FOR SERVICE
1. Disconnect main power supply.
2. Remove condensate pan and screws
from bottom of front panel. Pull out and
remove from panel.
TIMER SWITCH
When the pressure regulating valve is
CLOSED, the timer switch initiates the tim-
ing circuit.
1. See ACCESS FOR SERVICE.
2. With needle nose pliers, disconnect
one wire from the switch (1).
3. CLOSE pressure regulating valve.
Check between remaining wire and
terminal where other wire was discon-
nected with an ohmmeter. Meter
should indicate a closed circuit. If not,
mounting bracket is out of adjustment
or switch is faulty.
Timer
Switch Adjustment:
1. See ACCESS FOR SERVICE.
2. With pliers, bend mounting bracket (2)
closer or further away from control
rod.
Timer
Switch Replacement:
1. See ACCESS FOR SERVICE.
2. Remove wires from switch.
3. Remove two mounting screws.
4. Install new switch in reverse order. Be
sure all wire connections are secure
and in their original location.
broaster.com Manual #17280 1/15 Rev 6/15
Summary of Contents for 2400 Series
Page 2: ......
Page 8: ......
Page 12: ......
Page 14: ...2 2 2400E 208 or 240VAC C NO NC broaster com Manual 17280 1 15 ...
Page 15: ...2 3 2400GH NO NC C broaster com Manual 17280 1 15 ...
Page 16: ......
Page 35: ...5 COVER YOKE AND LIFT 5 1 FAMILIARIZATION broaster com Manual 17280 1 15 ...
Page 44: ......
Page 70: ......
Page 71: ...broaster com Manual 17280 1 15 SERVICE NOTES ...
Page 72: ...broaster com Manual 17280 1 15 SERVICE NOTES ...
Page 73: ...broaster com Manual 17280 1 15 SERVICE NOTES ...
Page 74: ...broaster com Manual 17280 1 15 SERVICE NOTES ...
Page 75: ......
Page 76: ...Broaster Company 2855 Cranston Road Beloit WI 53511 3991 608 365 0193 broaster com ...