Observe the following when mounting this device:
•
The kit is compatible with rack rails that are either 3 inches or 5 inches wide (adapters are provided for 3-in. rails).
•
Before mounting your device, review any specific installation and facility requirements in this Hardware Installation Guide.
•
Hardware devices illustrated in these procedures are only for reference and may not depict the device you are installing into the
rack.
Time and Items required
Allow approximately one hour to unpack and install a chassis in a rack.
The following tools are required when installing the 14U Chassis Mid-Mount Rack Kit for Two-Post Racks.
•
Torque wrench with #2 Phillips screwdriver tip
•
Flathead screwdriver
•
Hydraulic or assisted lift with a minimum raise of 140 cm (55 in.) and a minimum capacity of 113 kg (250 lbs).
Parts list
The following parts are provided with the 14U Chassis Mid-Mount Rack Kit for Two-Post Racks (XBR-DCX-0121).
Installing the 14U Chassis Mid-Mount Rack Kit for Two-Post Racks (XBR-DCX-0121)
Brocade X6-8 Director Hardware Installation Guide
40
53-1004105-07
Summary of Contents for X6-8
Page 12: ...Brocade X6 8 Director Hardware Installation Guide 12 53 1004105 07...
Page 20: ...Brocade X6 8 Director Hardware Installation Guide 20 53 1004105 07...
Page 28: ...Brocade X6 8 Director Hardware Installation Guide 28 53 1004105 07...
Page 68: ...Brocade X6 8 Director Hardware Installation Guide 68 53 1004105 07...
Page 84: ...Brocade X6 8 Director Hardware Installation Guide 84 53 1004105 07...
Page 130: ...Brocade X6 8 Director Hardware Installation Guide 130 53 1004105 07...
Page 142: ...Brocade X6 8 Director Hardware Installation Guide 142 53 1004105 07...
Page 160: ...Brocade X6 8 Director Hardware Installation Guide 160 53 1004105 07...
Page 184: ...Brocade X6 8 Director Hardware Installation Guide 184 53 1004105 07...
Page 196: ...Brocade X6 8 Director Hardware Installation Guide 196 53 1004105 07...
Page 230: ...Brocade X6 8 Director Hardware Installation Guide 230 53 1004105 07...