2. Prongs must engage inside lock housing.
3. Align outside rose so rose posts enter thru-bolt holes
in door.
4. Check from inside of door to see if latch is properly engaged.
INSTALL INSIDE TRIM:
1. Replace inside rose assembly and fasten to outside rose
with the two long thru-bolts.
2. Press rose cover over inside rose. Notch in cover must
align with either notch on inside rose.
1. Remove inside lever. Depress the lever catch with the wire
pin through the small hole in the rose/lever and pull lever
off the tube.
2. Depress lever catch again and remove the inside rose
assembly.
INSTALL LEVER:
1. Press lever on lock tube, slightly wiggle and push until
lever engages lever catch and connector prongs.
2. Test lever to be sure it is on securely.
IC CORE CYLINDER:
Removal (all functions)
1. Insert control key and turn clockwise, then pull on
key to remove core.
1. Insert screwdriver into key cam slot in tube and
turn fully clockwise.
DB Function
1. Using a screwdriver, place the tip into the key cam
slot and turn counter-clockwise as far as possible.
When at the maximum counter-clockwise position,
turn clockwise 90°. Insert outside IC core cylinder
into lever.
2. Test to see that timing is correct for both inside and
outside levers.
T Function
1. Insert screwdriver in key cam slot and turn fully clockwise
without retracting latch. Now turn counterclockwise 45°.
Remove screwdriver.
Correct orientation of spacer for
conversion of 7 pin tailpiece for
use with 6 pin ic core.
PREPARE LOCK (Fig.
7
):
Figure
7
Figure
8
INSTALL LOCK (Fig.
8
):
INSTALLING THE LOCK
CHANGE/REPLACE IC CORE CYLINDER
1. Insert control key in core and turn clockwise.
2. Insert tailpiece
P-ICT1
in core.
3. With control key in core, insert core fully into
lock.
4.
Turn key counter-clockwise and remove key.
360 (Inside) 370, 372, 373, 377
I-C300-2013-01 Page 2
IC Tailpieces
IC Keyed
Function
s
Figure
9
1. Push lock through 2-1/8"
(54mm)
hole from the
outside so that retractor engages latch tail.
2. Insert control key in core and turn clockwise.
3. Insert tailpiece
P-ICT2
in core.
4. With control key in core, insert core fully into lock.
5.
Turn key counterclockwise and remove key.
2. Insert control key in core and turn clockwise.
3. Insert tailpiece
P-ICT2
in core.
4. With control key in core, insert core fully into lock.
5. Turn key counter-clockwise and remove key.
Brookline Industries • 1624 South Clinton Street • Chicago Illinois 60616 USA • http://brooklineindustries.com
Installation
of Core for Functions
351, 353, 355, 360 (Outside) 380, 382
Rose Posts
chbolt