Startup and Test
The Startup and Test section requires that the Polycold Cryochiller is fully installed and that the vacuum
chamber is operational.
1.
Confirm that cooling water is on and flowing properly through the system.
2.
Turn on the electrical power source for the refrigeration unit.
3.
Move CB-1 to the ON position. See
4.
Move CB-2 to the ON position. See
.
5.
Wait for the system to boot up. Boot up takes less than one minute.
When boot up is complete, the system HMI screen displays information.
6.
On systems equipped with the EMO, twist the EMO switch clockwise to confirm that it is in the Out
or disengaged position. See
7.
Move the compressor On/Off switch to the ON position. See
The unit should go to the Standby mode. See
Item Description
Electrical Category
Type 2 - Equipment is energized. Energized circuits are covered or insulated
Tools and materials:
No tools required
Figure 4-37: Move CB-1 to ON
Figure 4-38: Move CB-2 to ON