1.2.8
Setting Top Stopping Point
1.
Replace the top stopping limit ramp; but do
not fully tighten the screws at this point.
2.
Switch the power back on to operate
the stairlift.
Run the stairlift back to the top of the
stairs until it comes to a full stop.
Check how level the footrest is with the
landing using the spirit level.
3.
If the footrest IS NOT level with the
landing, run the stairlift down 3 / 4 stairs
and stop.
Slide the stopping ramp up or down to a
suitable position.
Run the stairlift back to the top of the stairs
and check to see if the footrest is level with
the landing.
If not, repeat until correct.
When top stopping position is correct tighten
the screws on stopping ramp.
4.
Position the plastic rail end stop at the end
of the gear rack and drill a 3mm hole into the
aluminium rail. Secure using the screw
provided.
In cases where it is necessary
to cut the rail and gear rack to
length, this plastic end stop
will secure and prevent any
possible movement of loose
gear rack.
23
�
Summary of Contents for Stairlift
Page 1: ...BROOKS STAIRLIFTS SUPERGLIDE 120 INSTALLATION PROCEDURES...
Page 5: ...Pre Installation Procedure 5 Open the bag that contains the remotes batteries and keys...
Page 6: ...Box Contents 6 CARRIAGE BOX...
Page 7: ...7 SEAT BOX...
Page 8: ...8 RAIL BOX...
Page 31: ...31...
Page 32: ...2006 Brooks Stairlifts REGISTER YOUR BROOKS STAIRLIFT AT www brooksstairlifts com register...