background image

 

4/23 

 

 

 

 

brookvent.co.uk 

 

 

Turn off the main switch whenever a malfunction is detected or when cleaning.  

 

For  installation  an  omnipolar  switch should  be  incorporated  in  the  fixed  wiring,  in 
accordance  with  the  wiring  regulations,  to  provide  a  full  disconnection  under 
overvoltage category III conditions (contact opening distance equal to or greater than 
3mm).  

 

If the supply cord is damaged, it must be replaced by the manufacturer, its service 
agent or similarly qualified persons in order to avoid a hazard.  

 

Do not obstruct the fan or exhaust grille to ensure optimum air passage.  

 

Ensure adequate air return into the room in compliance with existing regulations in 
order to ensure proper device operation.  

 

If  the  environment  in  which  the  product  is  installed  also  houses  a  fuel-operating 

device (water heater, methane stove etc., that is not a “sealed chamber” type), it is 

essential  to  ensure  adequate  air  intake,  to  ensure  good  combustion  and  proper 
equipment operation.  

 

Install the product so that the impeller is not accessible from the air outlet side as 

verified  by  contact  with  the  Test  Finger  (test  probe  “B”  of  the  norm  EN61032)  in 

compliance with the current safety regulations.  

 

Ceiling  installation

  In  order  to  guarantee  the  IPX4  degree  of  protection  against 

moisture in case of ceiling installation, use the appropriate ceiling mount kit, which is 
not included. Use only the rear entry hole for supply cables. If there is a possibility of 
condensation  along  the  air  discharge  duct,  provide  a  drainage  system  to  prevent 
condensation from discharging into the environment through the fan. Attention: do 
not mount the product on the ceiling without this kit.  

 

Window  installation

  In  case  of  window  installation  it  is  necessary  to  use  the 

appropriate window kit, which is not included. Attention: do not mount the product 
on the window without this kit 

 

2.2  Responsibility of the Installer 

 

 

Correct Installation, balancing and commissioning of the DMEV unit. 

 

Record measured air flow volumes on each of the valves at High and Low rate. 

 

Compliance to requirements and local additional rules. 

 

Explanation of the ventilation system to the user. 

 

All the above, as set out in the latest edition of the Domestic Ventilation 
Compliance Guide and the SAP Appendix Q 

 Installation Guide and Checklist 

specific to the UK market.

 

 

 
 
 

Summary of Contents for AF 90-DMEV-100

Page 1: ...ng airstream DMEV models PRODUCT CODE DESCRIPTION AF 90 DMEV 100 airstream DMEV 100 AF 90 DMEV 100CF airstream DMEV 100 CF AF 90 DMEV 100HT airstream DMEV 100 HT AF 90 DMEV 150HT airstream DMEV 150 HT...

Page 2: ...y 3 2 2 Responsibility of the Installer 4 2 3 Responsibility of the Occupant 5 3 0 Specifications Dimensions 5 3 1 Installation 6 3 2 Detailed Specification 7 3 3 ErP Directive Regulations 1253 2014 1...

Page 3: ...duct Guarantee This product is guaranteed against defects for a period of 2 years from date of purchase with the first year covering parts and labour and the remaining year covering parts only In the...

Page 4: ...Cleaning and user maintenance shall not be made by children without supervision Do not use the product in the presence of inflammable vapours such as alcohol insecticides gasoline etc If any abnormali...

Page 5: ...ified by contact with the Test Finger test probe B of the norm EN61032 in compliance with the current safety regulations Ceiling installation In order to guarantee the IPX4 degree of protection agains...

Page 6: ...ge To ensure that the system is functioning properly on a regular basis To use manual boost switches where provided to prevent build up of pollutants or mould growth 3 0 Specifications Dimensions Prod...

Page 7: ...6 23 brookvent co uk 3 1 Installation Perimetrical exhausting Wall Ceiling accessory on demand Window kit on demand Direct exhausting Short ducting...

Page 8: ...optimise acoustic properties and efficiency Single phase EC Brushless motor with integral thermal protection Motor mounted on high quality ball bearings The fan is double insulated no earth connection...

Page 9: ...8 23 brookvent co uk 3 3 ErP Directive Regulations 1253 2014 1254 2014...

Page 10: ...9 23 brookvent co uk...

Page 11: ...10 23 brookvent co uk...

Page 12: ...11 23 brookvent co uk 3 4 SAP Appendix Q Results Results for rigid duct applications Results for flexible duct applications...

Page 13: ...12 23 brookvent co uk 3 5 Airflow Pressure Performance Curve...

Page 14: ...13 23 brookvent co uk 4 0 Mounting In case of surface cable installation...

Page 15: ...14 23 brookvent co uk for step number 12 please look at Electrical Connections Wiring section 5 1 Wiring Schematic page 16 In case of recessed cable installation...

Page 16: ...15 23 brookvent co uk for step number 12 please look at Electrical Connections Wiring section 5 1 Wiring Schematic page 16...

Page 17: ...carried out by a qualified electrician Installations and wiring must conform to current IEE regulations UK local or appropriate regulations applying to other countries Electrical Details Voltage 230 V...

Page 18: ...17 23 brookvent co uk Constant flow version...

Page 19: ...ediate between the selected trickle speed and the boost speed When the percentage of Relative Humidity goes below the threshold the fan continues to function at comfort boost speed for a factory set p...

Page 20: ...peed for a settable period of time then it returns to selected trickle speed The over run timer function is activated only if the external switch has been on for at least 60 seconds Jumper switches In...

Page 21: ...ll 61m3 h 17l s through wall 76m3 h 21l s through wall 90m3 h 25l s through wall 104m3 h 29l s default airstream DMEV 100 CF JUMPER INSTALLATION AIRFLOW 1 2 3 constant flow 47m3 h 13l s constant flow...

Page 22: ...21 23 brookvent co uk 7 0 Maintenance Warning Dangerous Voltage Before completing any form of maintenance ensure to isolate the unit from the mains and ensure all supply circuits are disconnected...

Page 23: ...22 23 brookvent co uk Notes...

Page 24: ...ore than happy to assist you Brookvent Brook House Dunmurry Industrial Estate Dunmurry Belfast Northern Ireland BT17 9HU T 44 0 28 9061 6505 It is important to retain this manual and make a copy avail...

Reviews: