5 - 5 4
Confidential
5.1.15 Engine Unit and Maintenance Unit
During disassembly jobs, except when removing the ink refill ASSY or engine unit (including the
maintenance unit), leave the head/carriage unit and all four ink cartridges in the machine.
Before removing the head/carriage unit, ink refill ASSY or engine unit, you need to replace the
current ink cartridges with dummy ones and drain ink from the ink refill ASSY and head/carriage
unit (see
). After ink draining, be sure to set protective cartridges instead of dummy
ones.
Removing the engine unit
(1) Lift the engine unit up and out of the lower cover.
NOTE:
When handling the engine unit, hold it at the both ends with both hands taking care not
to touch the PF encoder disk. Do not hold it with one hand at the center, particularly at the
carriage rail section.
NOTE:
Do not place the engine unit directly on a flat surface; doing so may break the PF
encoder disk and gears. Be sure to place a support pad under the engine unit as illustrated
below.
Paper ejection
roller gear
Paper feed roller gear
PF encoder disk
Support pad
Lower cover
Engine unit
Summary of Contents for DCP-340CW
Page 1: ...Confidential FACSIMILE EQUIPMENT SERVICE MANUAL MODELS MFC820CW MFC640CW DCP340CW ...
Page 9: ...Confidential CHAPTER 1 PARTS NAMES FUNCTIONS ...
Page 20: ...Confidential CHAPTER 2 SPECIFICATIONS ...
Page 37: ...Confidential CHAPTER 3 THEORY OF OPERATION ...
Page 80: ...Confidential CHAPTER 4 TRANSFER OF DATA LEFT IN THE MACHINE TO BE SENT FOR REPAIR ...
Page 85: ...Confidential CHAPTER 5 DISASSEMBLY REASSEMBLY AND LUBRICATION ...
Page 163: ...Confidential CHAPTER 6 ADJUSTMENTS AND UPDATING OF SETTINGS REQUIRED AFTER PARTS REPLACEMENT ...
Page 181: ...6 16 Confidential Vertical Alignment Check Patterns ...
Page 184: ...6 19 Confidential Margin Check Pattern ...
Page 193: ...Confidential CHAPTER 7 CLEANING ...
Page 196: ...Confidential CHAPTER 8 MAINTENANCE MODE ...
Page 205: ...8 7 Confidential Scanning Compensation Data List a b c d e f i ...
Page 207: ...8 9 Confidential Test Pattern ...
Page 212: ...8 14 Confidential Configuration List ...
Page 216: ...8 18 Confidential DCP340CW 1 2 3 4 6 5 7 11 12 13 8 14 15 9 10 Key Entry Order 2 ...
Page 232: ...8 34 Confidential 1st sheet 2nd sheet Vertical Alignment Check Patterns ...
Page 235: ...8 37 Confidential Margin Check Pattern ...
Page 249: ...Confidential CHAPTER 9 ERROR INDICATION AND TROUBLESHOOTING ...
Page 376: ...B Power Supply PCB U S A and Canadian models Confidential ...
Page 377: ...B Power Supply PCB European Asian and Oceanian models Confidential ...
Page 406: ...Confidential August 05 SM FAX046 8CA817 Printed in Japan ...