3-10
Confidential
3.2.2.2 Ink supply and ink jet mechanism
[ 1 ] Overview
The ink supply and ink-jet mechanism consists of the head/carriage unit, four ink cartridges, ink
refill assembly, and ink supply tubes.
The head/carriage unit scans the surface of the recording paper, jetting out ink supplied through the
ink supply tubes onto the paper to produce images. For further details, see "
" below.
The four ink cartridges (black, yellow, cyan, and magenta) are mounted on the ink refill assembly.
For further details, see "
" below.
The ink refill assembly secures the ink cartridges and connects them to the corresponding ink
supply tubes. Ribs inside the cartridge slots prevent wrong cartridge insertion and color mixups. For
further details, see "
" below.
The ink supply tubes supply the head/carriage unit with ink from the ink cartridges. For further
details, see "
" below.
(Ink absorber box)
Head/carriage unit
Ink supply tubes
Ink refill ASSY
Ink cartridges
(Maintenance unit)
Summary of Contents for DCP-340CW
Page 1: ...Confidential FACSIMILE EQUIPMENT SERVICE MANUAL MODELS MFC820CW MFC640CW DCP340CW ...
Page 9: ...Confidential CHAPTER 1 PARTS NAMES FUNCTIONS ...
Page 20: ...Confidential CHAPTER 2 SPECIFICATIONS ...
Page 37: ...Confidential CHAPTER 3 THEORY OF OPERATION ...
Page 80: ...Confidential CHAPTER 4 TRANSFER OF DATA LEFT IN THE MACHINE TO BE SENT FOR REPAIR ...
Page 85: ...Confidential CHAPTER 5 DISASSEMBLY REASSEMBLY AND LUBRICATION ...
Page 163: ...Confidential CHAPTER 6 ADJUSTMENTS AND UPDATING OF SETTINGS REQUIRED AFTER PARTS REPLACEMENT ...
Page 181: ...6 16 Confidential Vertical Alignment Check Patterns ...
Page 184: ...6 19 Confidential Margin Check Pattern ...
Page 193: ...Confidential CHAPTER 7 CLEANING ...
Page 196: ...Confidential CHAPTER 8 MAINTENANCE MODE ...
Page 205: ...8 7 Confidential Scanning Compensation Data List a b c d e f i ...
Page 207: ...8 9 Confidential Test Pattern ...
Page 212: ...8 14 Confidential Configuration List ...
Page 216: ...8 18 Confidential DCP340CW 1 2 3 4 6 5 7 11 12 13 8 14 15 9 10 Key Entry Order 2 ...
Page 232: ...8 34 Confidential 1st sheet 2nd sheet Vertical Alignment Check Patterns ...
Page 235: ...8 37 Confidential Margin Check Pattern ...
Page 249: ...Confidential CHAPTER 9 ERROR INDICATION AND TROUBLESHOOTING ...
Page 376: ...B Power Supply PCB U S A and Canadian models Confidential ...
Page 377: ...B Power Supply PCB European Asian and Oceanian models Confidential ...
Page 406: ...Confidential August 05 SM FAX046 8CA817 Printed in Japan ...