4-33
Confidential
< Installing Procedure >
(1) Put the Hook of the Separation pad ASSY MP into the MP feed frame and pull down the
Separation pad ASSY MP to the direction of the arrow 1b until it is locked.
Fig. 4-45
(2) Lift up the Lift arm MP and put the MP roller holder ASSY into the MP feed frame. Put
the Pin of the MP roller holder ASSY into the hole of the Lift arm MP.
Fig. 4-46
1a
MP feed frame
MP frame
Separation pad ASSY MP
1b
1b
MP feed frame
Lift arm MP
MP roller holder ASSY
Pin
Summary of Contents for HL 5370DW
Page 12: ...CHAPTER 1 SPECIFICATIONS ...
Page 32: ...Confidential CHAPTER 2 THEORY OF OPERATION ...
Page 57: ...Confidential CHAPTER 3 ERROR INDICATION AND TROUBLESHOOTING ...
Page 109: ...Confidential CHAPTER 4 PERIODIC MAINTENANCE ...
Page 145: ...CHAPTER 5 DISASSEMBLY REASSEMBLY ...
Page 153: ...5 6 Confidential Fig 5 3 EM D110 4 places Separation pad ASSY ...
Page 154: ...5 7 Confidential 5 GEAR LAYOUT DRAWING Fig 5 4 ...
Page 213: ...5 66 Confidential 3 Remove the Gear 17 black Fig 5 86 4 Remove the Gear 17 white Fig 5 87 ...
Page 261: ...Confidential CHAPTER 6 ADJUSTMENTS AND UPDATING OF SETTINGS REQUIRED AFTER PARTS REPLACEMENT ...