3 - 87
Feed unit
Main unit
Assembly
16
Y motor final assembly attachment
1. Attach the Y motor final assembly
1
to the base frame with the 2 screws
1
.
*Key point
• Adjust the backlash of the Y motor gear and the Y-guide shaft
gear to zero.
• Make sure the Y motor gear and the Y-guide shaft gear are
parallel.
2. Apply MOLYKOTE EM-30L to the Y motor gear
2
.
3. Secure the Y motor final assembly's lead wire and the cord clamp NK-4N
to the base frame with the screw
2
.
0
Apply MOLYKOTE EM-30L to the Y motor gear.
Size of a grain of
rice
1
Torque
1.18 – 1.67 N-m
2
Torque
1.18 – 1.57 N-m
1
2
1
2
Screw, Pan (S/P washer)
M
4X10DB
Screw, Pan (S/P washer)
M
4X8DA
Summary of Contents for PR-600II
Page 1: ......
Page 2: ......
Page 20: ...2 2 Main parts Main unit ...
Page 33: ...2 15 Disassembly Feed unit Main unit ...
Page 44: ...2 26 Needle thread unit Main unit ...
Page 47: ...2 29 Disassembly Needle bar change unit Main unit ...
Page 50: ...2 32 Thread wiper unit Main unit ...
Page 54: ...2 36 Needle bar unit Main unit ...
Page 60: ...2 42 Upper shaft unit Main unit ...
Page 70: ...2 52 Lower shaft unit Main unit ...
Page 73: ...2 55 Disassembly Power unit Main unit ...
Page 78: ...2 60 Thread cut unit Main unit ...
Page 82: ...2 64 Thread tension unit Main unit ...
Page 91: ...2 73 Disassembly Operation panel Main unit ...
Page 98: ...2 80 ...
Page 100: ...3 2 Operation panel Main unit ...
Page 108: ...3 10 Thread tension unit Main unit ...
Page 118: ...3 20 Thread cut unit Main unit ...
Page 122: ...3 24 Power unit Main unit ...
Page 128: ...3 30 Lower shaft unit Main unit ...
Page 132: ...3 34 Upper shaft unit Main unit ...
Page 147: ...3 49 Assembly Needle bar unit Main unit ...
Page 157: ...3 59 Assembly Thread wiper unit Main unit ...
Page 162: ...3 64 Needle bar change unit Main unit ...
Page 166: ...3 68 Needle thread unit Main unit ...
Page 170: ...3 72 Feed unit Main unit ...
Page 188: ...3 90 Main unit Main unit ...
Page 282: ...4 42 ...
Page 311: ...6 1 6Maintenance ...
Page 333: ......