PARTS TO BE INSTALLED
7. Completely remove and discard the following
items from moving deck.
– Cable
– Retaining screws
– Washers
– Plate.
8. Install plastic caps on moving deck (from prede-
livery kit).
sbl2009-004-011_a
1. Plastic caps
9. Install M8 x 25 screws and M8 washers on
moving deck (from predelivery kit).
sbl2009-004-012_a
1. M8 washers
2. M8 x 25 screws
10. Tighten screws to 25 N•m (18 lbf•ft).
PARTS TO BE INSTALLED
Battery
WARNING
Never charge or boost battery while installed
in watercraft.
NOTICE
Always charge battery before its in-
stallation on the vehicle.
NOTICE
Make sure not to squeeze battery ca-
bles between vehicle components.
Battery Removal
1. Open the boarding platform.
ssi2009-002-002_a
1. Boarding platform
2. Remove the RH (starboard) storage bin.
NOTE:
The storage bin is secured using two plas-
tic rivets
ssi2009-002-003_a
1. RH (starboard) storage bin
3. Disconnect the diagnostic connector.
ssi2009-002-004_a
1. Diagnostic connector
4. Lift and push the top of electrical component
support forward to unlock it from battery holder.
6 / 23
2009-3
PREDELIVERY