Installation
98
H157655_1_008
11.3
Installation Requirements Checklist
For the installation the customer must provide the following:
Lifting equipment and minimum ceiling height as outlined in the table in
. Pallet jack and/or fork lift for transporting system
accessories.
___
A cylinder of N
2
gas 50l/200 bar (~2 cu.ft, 3000 psi, 4.6 grade) with reducing
regulator valves to deliver pressure of 0.5 bar (~8 psi), as specified in
.
___
A cylinder of He gas 50l/200 bar (~2 cu.ft, 3000 psi, 4.6 grade) with reducing
regulator valves to deliver a pressure of 0.2 bar (~3 psi), as specified in the
section
.
___
Quantities of liquid helium and nitrogen as specified in the table in
___
Liquid helium and nitrogen transport dewars as specified in
.
___
One power outlet 230V/16A (USA 208V/30A) single phase and two more
230V/16A (USA 208V/20A) single phase power outlets are needed to run a
vacuum pump, a heat gun, and a power supply unit. These power outlets must
be available in addition to the main power source used to run the spectrometer.
___
Step ladder (non-magnetic e.g. aluminum, fiberglass, or wood).
___
Where possible the customer should provide the following:
• Heat gun or hand held hair dryer (min. 1200 W).
• Cryogenic gloves.
• Electric screwdriver.
___
Table 11.2:
Installation Requirements Checklist
11.4
Installation Procedure
The various steps and procedures mentioned in the
detail in the following sections.
11.4.1
Magnet Assembly
When the magnet is delivered (do not uncrate it!) it must first be assembled by the installation
engineer. The assembly area must be clean, dry and free of dust.
The assembly may require that the engineer works beneath the magnet and thus special
rigging equipment is required.Refer to the section
special equipment requirements for assembly.
Summary of Contents for AVANCE
Page 6: ...Contents vi H157655_1_008 ...
Page 24: ...System Components 24 H157655_1_008 ...
Page 32: ...Magnet Access and Rigging 32 H157655_1_008 ...
Page 38: ...Ceiling Height Requirements 38 H157655_1_008 ...
Page 72: ...Utility Requirements 72 H157655_1_008 ...
Page 82: ...Floor Plan 82 H157655_1_008 ...
Page 96: ...CryoProbe and Other Accessories 96 H157655_1_008 ...
Page 102: ...Contact 102 H157655_1_008 ...
Page 104: ...List of Figures 104 H157655_1_008 ...
Page 109: ...H157655_1_008 109 ...
Page 110: ...Bruker Corporation info bruker com www bruker com Order No H157655 ...