13
©2009,1996 BRUNO INDEPENDENT LIVING AIDS, INC.®
SRE-1550 02-09-2009
1. Adjust the carriage angle by loosening
the angle adjustment bolts. Level the
angle adjustment bracket, using a
standard builder's level or protractor
level.
2. When the angle adjustment bracket is
level, securely tighten all four angle
adjustment bolts*.
TORQUE RATING = 70 LB-FT
angle adjustment
bracket
1. Turn toggle switch off. When facing
the front of the unit, remove the left
motor cover.
2. Slide the carriage into the rail until the
spur gear rests on the gear rack.
3. Manually turn the motor pulley to fully
engage the entire carriage inside the
upper rail.
INSTALLATION
MOUNTING CARRIAGE ON UPPER RAIL
Residential and Commercial Units
ADJUSTING THE CARRIAGE ANGLE
Residential and Commercial Units
angle adjustment
bolts
circuit breaker with built-in
ON/OFF switch