PAGE 12
BRUNSWICK INSTALLATION MANUAL
BLACK WOLF PRO
RAIL ASSEMBLY
FIGURE ONE
Step #1:
Place corner casting upside down on oor. Seat
end and side rail clearance holes onto corner casting
posts.
Step #2:
Firmly hold end and side rails together, keep
them, square by using a carpenter’s square against the
cushions.
Step #3:
Attach using 1/4-20 x 1” hex head bolt
and 1/4” fender washers.
FIGURE ONE
FIGURE TWO
Step #4:
Using the center hole in tie plate, loosely attach
it to the corner casting post using 1/4-20 X 1” hex head
bolt and 1/4” ID fender washer.
FIGURE TWO
FIGURE THREE
Position tie plate and drill four pilot holes. Install four
#10 x 3/4 C.R pan head tapping screws. Tighten
screw installed in
step #4.
FIGURE THREE
FIGURE FOUR
Step #5:
Thread a stud into the pre-positioned nut
plates inside each rail.
NOTE: Three places per rail.
FIGURE FOUR
!
NOTE: DO NOT OVER TIGHTEN
1/4-20 x 1”
HEX HEAD BOLT
CARPENTER’S SQUARE
1/4” FENDER
WASHER
END RAIL
CORNER
CASTING
SIDE RAIL
1/4-20 x 1”
HEX HEAD BOLT
1/4” FENDER
WASHER
TIE PLATE
CORNER CASTING POST
TIE PLATE
#10-3/4” C.R. PAN HEAD
TAPPING SCREW
3/8-16 x 2-3/4” STUD