Finish Commissioning the Boiler:
Reconnect any wires from the external control
system, if applicable.
1.
Perform an operation test of the external
control system.
2.
Place system control back in normal
operation, if necessary.
3.
Place the boiler into automatic mode.
Menu > Operation > Auto / Manual Rate
Control > Automatic (76 password
required)
4.8
Re-Starting After Prolonged
Shutdown
Use the following recommendations prior to
re-starting the heating system after prolonged
shutdown.
1.
Perform Pre-Start-Up Inspection by
checking all gas, water, air intake and
venting connections to ensure proper,
leak-free connections and that the water
and gas lines has been cleaned
completely.
2.
Ensure that combustion air piping, vent
piping, and terminations are free of
obstructions.
3.
Inspect the boiler for damage and loose
wire connections.
4.
Remove all flammable material present in
the vicinity of the boiler.