START-UP CHECKLIST
MODEL NO.:
SOFTWARE VERSION (SEE FIG. 11)
DATE:
SERIAL NO.:
TECHNICIAN:
PRE-START-UP:
M
VERIFY THAT DIP SWITCH SETTINGS ARE CORRECT
M
VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
M
REMOVE ALL SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTRUCTIONS
M
VERIFY INSTALLATION OF ECONOMIZER HOOD
M
VERIFY INSTALLATION OF ALL OPTIONS AND ACCESSORIES
M
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS
M
VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
M
CHECK GAS PIPING FOR LEAKS
M
CHECK THAT INDOOR-AIR FILTERS ARE CLEAN AND IN PLACE
M
VERIFY THAT UNIT IS LEVEL WITHIN TOLERANCES
M
CHECK FAN WHEELS AND PROPELLERS FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW
IS TIGHT
M
VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
M
VERIFY THAT SUCTION, DISCHARGE, AND LIQUID SERVICE VALVES ON EACH CIRCUIT ARE OPEN
START-UP:
ELECTRICAL
SUPPLY VOLTAGE
L1-L2
L2-L3
L3-L1
COMPRESSOR AMPS — COMPRESSOR NO. 1
L1
L2
L3
— COMPRESSOR NO. 2
L1
L2
L3
SUPPLY FAN AMPS
EXHAUST FAN AMPS
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
F DB (Dry Bulb)
RETURN-AIR TEMPERATURE
F DB
F
WB (Wet Bulb)
COOLING SUPPLY AIR
F
GAS HEAT SUPPLY AIR
F
PRESSURES
GAS INLET PRESSURE
IN. WG
GAS MANIFOLD PRESSURE
STAGE NO. 1
IN. WG
STAGE NO. 2
IN. WG
REFRIGERANT SUCTION
CIRCUIT NO. 1
PSIG
CIRCUIT NO. 2
PSIG
REFRIGERANT DISCHARGE
CIRCUIT NO. 1
PSIG
CIRCUIT NO. 2
PSIG
M
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGE 31
CL-1