Table 7 – Minimum Allowable Input Rating of

Space--Heating Appliance in Thousands of BTUH per Hour

VENT HEIGHT

FT (M)

INTERNAL AREA OF CHIMNEY

IN

2

. (MM

2

)

12

(7741)

19

(12258)

28

(18064)

38

(24516)

Local 99% Winter Design

Temperature: 17 to 26

_

F* (---8 to ---3

_

C)

6 (1.8)

0

55

99

141

8 (2.4)

52

74

111

154

10 (3.0)

NR

90

125

169

15 (4.6)

NR

NR

167

212

20 (6.1)

NR

NR

212

258

30 (9.1)

NR

NR

NR

362

Local 99% Winter Design

Temperature: 5 to 16

_

F* (---15 to ---9

_

C)

6 (1.8)

NR

78

121

166

8 (2.4)

NR

94

135

182

10 (3.0)

NR

111

149

198

15 (4.6)

NR

NR

193

247

20 (6.1)

NR

NR

NR

293

30 (9.1)

NR

NR

NR

377

Local 99% Winter Design

Temperature: ---10 to 4

_

F* (---23 to ---16

_

C)

6 (1.8)

NR

NR

145

196

8 (2.4)

NR

NR

159

213

10 (3.0)

NR

NR

175

231

15 (4.6)

NR

NR

NR

283

20 (6.1)

NR

NR

NR

333

30 (9.1)

NR

NR

NR

NR

Local 99% Winter Design

Temperature: ---11

_

F (---24

_

C) or lower

Not recommended for any vent configuration.

*

The 99.6% heating db temperatures table found in the Appendix of the

Climatic Design Information chapter of the 2017 ASHRAE Fundamentals

Handbook.

Inspections before the sale and at the time of installation will

determine the acceptability of the chimney or the need for repair
and/or (re)lining. Refer to the Fig. 31 to perform a chimney

inspection. If the inspection of a previously used tile--lined
chimney:

a. Shows signs of vent gas condensation, the chimney

should be relined in accordance with local codes and the

authority having jurisdiction. The chimney should be re-
lined with a listed metal liner, or a Type--B vent shall be

used to reduce condensation. If a condensate drain is re-
quired by local code, refer to the current edition of NFGC
NFPA54/ANSI Z223.1, Section 12.10 for additional in-

formation on condensate drains.

b. Indicates the chimney exceeds the maximum permissible

size in the tables, the chimney should be rebuilt or relined
to conform to the requirements of the equipment being

installed and the authority having jurisdiction.

A chimney without a clay tile liner, which is otherwise in good

condition, shall be rebuilt to conform to current edition of
ANSI/NFPA 211 or be lined with a UL listed metal liner or UL

listed Type--B vent. Relining with a listed metal liner or Type--B
vent is considered to be a vent--in--a--chase.
If a metal liner or Type--B vent is used to line a chimney, no other
appliance shall be vented into the annular space between the

chimney and the metal liner.

Exterior Masonry Chimney FAN + NAT

Installations with Type--B Double Wall Vent

Connectors

NFPA & AGA

Table 8 – Combined Appliance Maximum Input Rating in

Thousands of BTUH per Hour

VENT HEIGHT

FT. (M)

INTERNAL AREA OF CHIMNEY

IN

2

(MM

2

)

12

(7741)

19

(12258)

28

(18064)

38

(24516)

6 (1.8)

74

119

178

257

8 (2.4)

80

130

193

279

10 (3.0)

84

138

207

299

15 (4.5)

NR

152

233

334

20 (6.0)

NR

NR

250

368

30 (9.1)

NR

NR

NR

404

APPLIANCE APPLICATION REQUIREMENTS

Appliance operation has a significant impact on the performance

of the venting system. If the appliances are sized, installed,
adjusted, and operated properly, the venting system and/or the

appliances should not suffer from condensation and corrosion.

The venting system and all appliances shall be installed in
accordance with applicable listings, standards, and codes.
The furnace should be sized to provide 100 percent of the design
heating load requirement plus any margin that occurs because of

furnace model size capacity increments. Heating load estimates

can be made using approved methods available from Air
Conditioning Contractors of America (Manual J); American

Society of Heating, Refrigerating, and Air--Conditioning
Engineers; or other approved engineering methods. Excessive

oversizing of the furnace could cause the furnace and/or vent to
fail prematurely. When a metal vent or metal liner is used, the

vent must be in good condition and be installed in accordance

with the vent manufacturer’s instructions.
To prevent condensation in the furnace and vent system, the

following precautions must be observed:

1. The return--air temperature must be at least 60

_

F

(16

_

C)db except for brief periods of time during warm--up

from setback at no lower than 55

_

F (13

_

C) db or during

initial start--up from a standby condition.

2. Adjust the gas input rate per the installation instructions.

Low gas input rate causes low vent gas temperatures,

causing condensation and corrosion in the furnace and/or
venting system.

3. Adjust the air temperature rise to the midpoint of the rise

range or slightly above. Low air temperature rise can cause

low vent gas temperature and potential for condensation
problems.

4. Set the thermostat heat anticipator or cycle rate to reduce

short cycling.

Air for combustion must not be contaminated by halogen

compounds which include chlorides, fluorides, bromides, and
iodides. These compounds are found in many common home

products such as detergent, paint, glue, aerosol spray, bleach,

cleaning solvent, salt, and air freshener, and can cause corrosion
of furnaces and vents. Avoid using such products in the

combustion--air supply. Furnace use during construction of the
building could cause the furnace to be exposed to halogen

compounds, causing premature failure of the furnace or venting
system due to corrosion.
Vent dampers on any appliance connected to the common vent

can cause condensation and corrosion in the venting system. Do
not use vent dampers on appliances common vented with this

furnace.

Summary of Contents for 830CA

Page 1: ...REQUIREMENTS 23 SIDEWALL VENTING 23 START UP ADJUSTMENT AND SAFETY CHECK 25 GENERAL 25 START UP PROCEDURES 25 ADJUSTMENTS 25 FURNACE SETUP SWITCHES 26 AIR DELIVERY CFM 30 COOLING OR CONTINUOUS AIRFLO...

Page 2: ...ir for Combustion and Ventilation section 4 Combustion products must be discharged outdoors Connect this furnace to an approved vent system only as specified in the Venting section of these instructio...

Page 3: ...M VENT CONNECTION IN MM SIZE SHIP WT LB KG ACCESSORY FILTER MEDIA CABINET SIZE IN MM 36040C17 17 1 2 445 15 7 8 403 11 9 16 294 16 406 4 102 119 54 16 406 48060C17 17 1 2 445 15 7 8 403 11 9 16 294 16...

Page 4: ...Z223 1 Chapters 12 and 13 ELECTROSTATIC DISCHARGE ESD PRECAUTIONS PROCEDURE FURNACE RELIABILITY HAZARD Improper installation or service of furnace may cause premature furnace component failure Electro...

Page 5: ...include fluoride chloride bromide and iodide These elements can corrode heat exchangers and shorten furnace life Air contaminants are found in aerosol sprays detergents bleaches cleaning solvents sal...

Page 6: ...40 25807 7 178 27 17391 6 152 20 12904 5 127 100 000 50 32258 8 203 34 21739 7 178 25 16130 6 152 EXAMPLE Determining Free Area FURNACE WATER HEATER TOTAL INPUT 100 000 30 000 130 000 divided by 4 000...

Page 7: ...NFILTRATION METHOD Outdoor Combustion Air Method 1 Provide the space with sufficient air for proper combustion ventilation and dilution of flue gases using permanent horizontal or vertical duct s or o...

Page 8: ...ements apply to the Standard Method and to the Known Air Infiltration Rate Method 1 Adjoining rooms can be considered part of a space if a There are no closeable doors between rooms b Combining spaces...

Page 9: ...leveling legs 1 Position furnace on its back Locate and drill a hole in each bottom corner of furnace See Fig 10 2 For each leg install nut on bolt and then install bolt and nut in hole Install flat...

Page 10: ...nd RH side The furnace can be hung from floor joists rafters or trusses or installed on a non combustible platform blocks bricks or pad Table 4 Opening Dimensions In mm FURNACE CASING WIDTH APPLICATIO...

Page 11: ...r rack for assembly and installation options AIR DUCTS General Requirements The duct system should be designed and sized according to accepted national standards such as those published by Air Conditi...

Page 12: ...r other accessories All accessories MUST be connected to duct external to furnace casing A190346 Fig 14 Duct Flanges 1 4 6mm THREADED ROD 4 REQ SECURE ANGLE IRON TO BOTTOM OF FURNACE WITH 3 8 x3 4 19m...

Page 13: ...NOT cut into casing sides left or right Side opening is permitted for only upflow and most horizontal furnaces See Fig 19 Bypass humidifier connections should be made at ductwork or coil casing sides...

Page 14: ...hen flexible connectors are used the maximum length shall not exceed 36 inches 915 mm 3 When lever handle type manual equipment shutoff valves are used they shall be T handle valves 4 The use of coppe...

Page 15: ...nit Amps Unit Ampacity Minimum Wire Size AWG Maximum Wire Length ft Maximum Fuse or CKT BKR Amps Maximum Minimum 036040 115 60 1 127 104 11 4 12 6 14 29 15 048060 115 60 1 127 104 11 4 12 6 14 29 15 0...

Page 16: ...ithin furnace away from sharp edges rotating parts and hot surfaces ELECTRICAL CONNECTION TO J BOX Electrical Box on Furnace Casing Side FIRE OR ELECTRICAL SHOCK HAZARD Failure to follow this warning...

Page 17: ...1 4 in female quick connect terminals to the two male 1 4 in quick connect terminals on the control board marked EAC 1 and EAC 2 The terminals are rated for 115VAC 1 0 amps maximum and are energized d...

Page 18: ...CTORY 115 VOLT WIRING Connect Y Y2 terminal as shown for proper operation Some thermostats require a C terminal connection as shown If any of the original wire as supplied must be replaced use same ty...

Page 19: ...sition for heat pump installations 7 Dip switch No 2 on Thermidistat should be set in OFF position for single speed compressor operation This is factory default 8 Dip switch No 2 on Thermidistat shoul...

Page 20: ...local building codes and furnace and vent manufacturers instructions These furnaces are design certified as Category I furnaces in accordance with current edition of ANSI Z21 47 CSA 2 3 and operate w...

Page 21: ...CHIMNEY IN2 MM2 12 7741 19 12258 28 18064 38 24516 6 1 8 74 119 178 257 8 2 4 80 130 193 279 10 3 0 84 138 207 299 15 4 5 NR 152 233 334 20 6 0 NR NR 250 368 30 9 1 NR NR NR 404 APPLIANCE APPLICATION...

Page 22: ...22 A180242 Fig 31 Chimney Inspection Chart...

Page 23: ...termine the correct location of the knockout to be re moved 4 Use a hammer and screwdriver to strike a sharp blow be tween the tie points and work the slug back and forth until the slug breaks free CU...

Page 24: ...ove 3 Side outlet vent for upflow and downflow installations must use Type B vent immediately after exiting the furnace except when factory authorized Downflow Vent Guard Kit is used in the downflow p...

Page 25: ...not operate if any thermostat signal is present at the control Refer to service label attached to furnace or See Fig 38 Component test sequence is as follows a Inducer motor turns on at 50 duty cycle...

Page 26: ...26 Table 10 Furnace Setup Switch Description A190351...

Page 27: ...27 A190348 Fig 38 Service Label...

Page 28: ...p NOTE If orifice hole appears damaged or it is suspected to have been redrilled check orifice hole with a numbered drill bit of correct size Never redrill an orifice A burr free and properly sized or...

Page 29: ...onnect an amp meter as shown in Fig 41 across the R and W subbase terminals or R and W wires at wall R Y W G 10 TURNS THERMOSTAT SUBBASE TERMINALS WITH THERMOSTAT REMOVED ANITICIPATOR CLOCK ETC MUST B...

Page 30: ...5 1565 1525 1490 1455 1415 1375 1335 1295 CF Switches SW3 3 SW3 2 SW3 1 Cont Fan Default OFF OFF OFF 530 545 545 535 505 495 485 See Note 4 Continuous Fan Airflow SW3 OFF OFF ON 530 545 545 535 505 49...

Page 31: ...F OFF OFF 1785 1800 1805 1830 1830 1845 1855 1860 1850 1840 Cooling Airflow SW2 Low Cooling Airflow SW3 OFF OFF ON 635 630 See Note 4 OFF ON OFF 785 820 865 See Note 4 OFF ON ON 1040 1045 1070 1085 11...

Page 32: ...n furnace wiring diagram Fig 42 Cooling A C or Continuous Fan Airflow Selection Chart Check Safety Controls 1 Check Main Limit Switch es This control shuts off combustion control system and en ergizes...

Page 33: ...6 94 38 76 192 38 95 189 474 96 38 75 188 39 92 185 462 98 37 74 184 40 90 180 450 100 36 72 180 41 88 176 439 102 35 71 178 42 86 172 429 104 35 69 173 43 84 167 419 106 34 68 170 44 82 164 409 108 3...

Page 34: ...8 1 8 1 9 2 0 1646 925 1 8 1 8 1 8 1 9 950 1 8 1 8 1 8 1 8 975 1 8 1 8 1 8 1 8 1000 1 8 1 8 1 8 1 8 Table 16 Gas Valve Outlet Pressure for Gas Heat Values at Altitude 80 000 Tabulated Data Based on 8...

Page 35: ...TH HAZARD Failure to follow this warning could result in personal injury death and or property damage The ability to properly perform maintenance on this equipment requires certain knowledge mechanica...

Page 36: ...stall blower access door and replace outer door or refer to the SERVICE label on the front of the blower access door for more informa tion Component Self Test Component Test can ONLY be initiated by p...

Page 37: ...ving filter access door 2 Remove filter cabinet door 3 Slide filter out of cabinet 4 If equipped with permanent washable 3 4 in 19 mm fil ter clean filter by spraying cold tap water through filter in...

Page 38: ...n outdoor circuit breaker on after completing cooling cycle FLAME SENSOR CLEANING AND SERVICING IGNITOR Cleaning Flame Sensor The following items must be performed by a qualified service technician If...

Page 39: ...as follows NOTE The materials needed in item 9 can usually be purchased at local hardware stores a Remove metal screw fitting from wire brush to allow in sertion into cable b Insert the twisted wire...

Page 40: ...od If the transducer fails to reach target pressure the inducer motor IDM will remain running until tar get pressure is maintained After the transducer maintains pressure target the furnace control CP...

Page 41: ...he blower motor BLWM is operating When the thermostat is satisfied the R to G and Y circuit are opened The outdoor unit stops and the furnace blower BLWM and electronic air cleaner terminal EAC 1 will...

Page 42: ...cedure enough you will eventually shift the continuous blower airflow to the lowest CF selection as shown in Fig 42 The selection can be changed as many times as desired and is stored in the memory to...

Page 43: ...43 A190249 Fig 45 Wiring Diagram...

Page 44: ...gs for dealer listing by brand name or contact BRYANT HEATING COOLING SYSTEMS Consumer Relations Department P O Box 4952 Syracuse New York 13221 4952 1 800 428 4326 Have available the model number ser...

Reviews: