background image

I.

INSPECT PACKAGE AND CHECK EQUIPMENT

Inspect contents of packaged humidifier. File claim with shipping
company prior to installation if shipment is damaged or incom-
plete.
The package should contain:

1. Humidifier and media assembly

2. Humidistat

3. Template

4. Owner’s Manual

5. Warranty Certificate

6. Solenoid valve with bridge rectifier

7. Saddle valve assembly with adapter

8. Four sheet metal screws

9. Foam tape

10. Water noise reducer (use for water pressure over 60 psi)

11. 6-in. damper

12. Worm clamp for field-supplied drain tube

13. Humidifier maintenance instruction sticker

14. Bryant logo label

II.

SELECT LOCATION (SEE FIG. 1.)

Humidifier may be installed on either supply or return plenum.
If furnace has air conditioning coil, be sure humidifier does not
interfere with coil ends. Remember to provide clearance for
maintenance and evaporator pad removal.

III.

PREPARE PLENUM OPENING (SEE FIG. 2.)

1. Use template for marking humidifier opening.

2. Tape in place on plenum making sure template is level.

IMPORTANT:

For humidifier to operate properly it must be

level and mounted on a vertical surface.

3. Drill four 1/8-in. holes in plenum.

4. Cut opening in plenum using heavy solid lines on template

as a guide.

IV.

MOUNT THE HUMIDIFIER (SEE FIG. 3.)

1. Attach foam tape on inside of mounting flange.

2. Hook bottom notch of humidifier on opening cut in plenum.

3. Push top of humidifier to plenum aligning screw holes with

flange.

4. Align, level, and secure using top screws first.

5. Insert bottom screws and tighten all screws for air tight seal.

V.

INSTALL BYPASS DUCT

Attach field-supplied 6-in. diameter duct, elbow, or starting collar
with field-supplied 1/4-in. zip screws. Install supplied 6-in. damper
in 6-in. duct connector.

IMPORTANT:

On systems with central cooling, the damper

should be closed during cooling season to prevent bypass air.

CAUTION:

Do not support weight of bypass duct from

humidifier — damage could result.

Fig. 1—Installation of HUMBBLBP2018-A--

Bypass-Type Humidifier

A98363

BYPASS UNITS ONLY

VERTICAL

HORIZONTAL

BYPASS UNITS

DRILL (2) HOLES
IN DUCT
FOR #8 SHEETMETAL
SCREWS

"N" COIL

Fig. 2—Preparing Plenum Opening

A97096

TEMPLATE

PLENUM

LEVEL

Fig. 3—Mounting the Humidifier

A98364

FOAM TAPE

NOTCH

SCREWS

—2—

Summary of Contents for HUM

Page 1: ... signifies hazards which could result in personal injury or death CAUTION is used to identify unsafe practices which would result in minor personal injury or product and property damage WARNING Before installing or servicing system al ways turn off main power to system There may be more than 1 disconnect switch Turn off accessory heater power if applicable Electrical shock can cause personal injur...

Page 2: ...PORTANT For humidifier to operate properly it must be level and mounted on a vertical surface 3 Drill four 1 8 in holes in plenum 4 Cut opening in plenum using heavy solid lines on template as a guide IV MOUNT THE HUMIDIFIER SEE FIG 3 1 Attach foam tape on inside of mounting flange 2 Hook bottom notch of humidifier on opening cut in plenum 3 Push top of humidifier to plenum aligning screw holes wi...

Page 3: ...eck all connections for water leaks 3 Set thermostat to call for heat Set humidistat for highest humidity setting making sure contacts are closed After a few minutes of operation check the drain connection for leaks and to see if water is flowing through humidifier 4 Reverse thermostat and humidistat settings to insure proper shutdown 5 Reset thermostat to normal setting Reset humidistat to recomm...

Page 4: ...rts bag Read water noise reducer note located inside package for instructions For normal operation saddle valve need only be opened 1 full turn to meet performance requirements 3 Open valve and check installation for leaks NOTE Saddle valve is self piercing on copper lines 1 4 in hole must be drilled in steel or iron pipes Use only a grounded drill or a hand drill to avoid shock hazard Turn off wa...

Page 5: ...nds Remember to provide clearance for maintenance and evapo rator pad removal To reverse pad access from right to the left side 1 Remove side door and media pad assembly 2 Remove 4 screws and separate top assembly from lower mounting base See Fig 8 3 Rotate lower mounting base 180 degrees so side access door is now on left 4 Snap together top assembly to mounting base and reinstall screws 5 Replac...

Page 6: ...uctions For normal operation saddle valve need only be opened 1 full turn to meet performance requirements 3 Open valve and check installation for leaks NOTE Saddle valve is self piercing on copper lines 1 4 in hole must be drilled in steel or iron pipes Use only a grounded drill or a hand drill to avoid shock hazard Turn off water and drain the pipe prior to drilling 1 4 in hole VIII INSTALL HUMI...

Page 7: ...enance instruction sticker 16 Bryant logo label II SELECT LOCATION SEE FIG 12 Humidifier may be installed on either supply or return plenum If furnace has air conditioning coil be sure unit does not interfere with coil ends Remember to provide clearance for maintenance and evaporator pad removal III PREPARE PLENUM OPENING SEE FIG 2 1 Use template for marking humidifier opening 2 Tape in place on p...

Page 8: ...accordance with section INSTALLATION OF HUMIDIS TAT on page 10 2 Wire brown low voltage leads to furnace control board or install a field supplied step down transformer 115vac 24vac 60Hz to power solenoid valve See Fig 4 Make sure bridge rectifier is attached to coil of solenoid valve NOTE Wiring must comply with National Electrical Code and any local codes or ordinances that may apply IX START UP...

Page 9: ...ollar with field supplied 1 4 in zip screws Install supplied 6 in damper in 6 in duct connector IMPORTANT On systems with central cooling the damper should be closed during cooling season to prevent bypass air CAUTION Do not support weight of duct from humidi fier damage could result VI INSTALL DRAIN LINE 1 Use 1 2 in ID field supplied vinyl tubing or equivalent tubing to connect overflow drain co...

Page 10: ...ns in accordance with Installation Instruction supplied with the humidifier 1 Installer must be a trained experienced service person 2 Disconnect power supply before beginning installation 3 Conduct a thorough checkout before leaving installation I WALL MOUNTING LOW VOLTAGE 1 Choose a location for humidistat about 5 ft above floor on inside wall with average room temperature and relative humidity ...

Page 11: ...nob by pulling away from casing See Fig 18 b Lift off faceplate starting at right side Left end of faceplate protrudes under lip on casing See Fig 18 c Remove switch by removing 2 screws in back of casing Pressing tab on case Lift out control See Fig 19 6 Make connections to screw terminals on switch assembly Re install switch into casing secure with 2 short screws 7 While holding wire in place Mo...

Page 12: ... at least 1 complete cycle to make certain that all components are functioning properly Fig 21 Humidistat Installation Schematic A97105 CASE MOUNTING TEMPLATE MOUNTING SCREWS 2 FOAM GASKET MAKE OPENING IN DUCT MOUNT HUMIDISTAT CASE ALTERNATE PROCEDURE DRILL SIX 1 4 IN DIAMETER HOLES RECOMMENDED HUMIDISTAT SETTING OUTSIDE TEMPERATURES RECOMMENDED HUMIDISTAT SETTING 20 F 15 10 F 20 LO 0 F 25 10 F 30...

Reviews: