16
L
P
PH
1. Installation in the screed floor
Step 1
Remove the lid and unscrew the device carrier
from the housing . Lay the cables /conduits (L)
to the installation position of the floor socket and
insert them into a placeholder (PH) made of EPS or
plastic. Now pour the placeholder (PH) with screed
(E). The later construction height must be taken into
account. Let the screed (E) harden.