CRYSTAL CLEAN AIR
TM
GENERAL INSTALLATION GUIDELINES
9
BSE, Inc., 2246 Palmer Drive, Suite 108, Schaumburg, IL 60173
T: 866-360-5675 email: sales@bsesales.com web: www.bsesales.com
Unpack and Inspect for Freight Damage
CAUTION
Note:
After opening, if the unit is damaged, repack the unit as it was shipped to you. RETAIN ALL PACKING MATERIALS. In
general, freight damage claims will be denied if the original packing materials are not retained for the claims adjustor to
inspect. Call your supervisor on how to proceed with filing a freight claim and to order a replacement unit.
1.
Before opening the shipping container, verify you have the correct unit.
2.
Place the box on a solid surface right side up.
3.
Open the top of the box and fold back all of the flaps.
4.
Remove the protective packing material and place to the side.
5.
Check the unit nameplate data and model number. Verify the unit voltage, and capacities are correct before
proceeding.
6.
Locate and retain the factory-supplied parts, etc.
7.
Carefully lift the unit and inspect for freight damage. DO NOT lift by the slots. If damage is found, repack the unit
as it was received in the original container.
8.
If the unit is undamaged, remove and retain the installation manual.