Maintenance
Maintenance schedule
© BT
Repair manual
SWE100, 120, 120L, 120S, 140, 140L, 200D
5 – 7
Order no..
Date
Valid from serial no.
T code
258946-120
2012-08-30
6061850-
841×842×843
Support arm
wheel
11
5.5
1.Not applicable for SWE120S
Work area
Pos.
Action
750h/12m
Estima
ted
time
4110 Tiller arm
a
Check the mountings.
X
1:45
minutes
b
Inspect the operating
console for correct
mounting
X
c
Check the mounting of
the handle.
X
d
Check the force and
locking of the gas strut.
The tiller arm should
return to the top position
both from the bottom
position and from the
lower position where the
brake is applied.
X
Check that the braking
function is activated in
both upper and lower tiller
arm positions.
Wheels
Standard
measurements, mm
Minimum
dimensions,
mm
https://www.besttruckmanuals.com/