Maintenance
Maintenance schedule
© BT
Repair manual
SWE100, 120, 120L, 120S, 140, 140L, 200D
5 – 11
Order no..
Date
Valid from serial no.
T code
258946-120
2012-08-30
6061850-
841×842×843
Work area
Pos.
Action
750h/12m
Estima
ted
time
7100 Mast
a
Check for any cracks or damage.
X
16
minutes
b
Check that there is no looseness in the
mast's mounting points.
X
c
Check for play between the mast beam and
the inner runner's rollers.
X
d
Check the inner runner's side play.
X
e
Check for wear on lifting chains and
sprockets. See section "18.3 Main lift chain
system 7120".
500 h
f
Check the adjustment of the lifting chains
See section "18.3 Main lift chain system
7120".
500 h
g
Lubricate the inside surfaces of beam
flanges
X
a,c,d,e,f
b
g,h
j,k
20 mm
https://www.besttruckmanuals.com/