Boiler block assembly
8
Logano GE515 - We reserve the right to make any changes due to technical modifications.
41
z
Hook the front cover (Fig. 52,
[1]
) with both hooks
) into the front side panels.
z
Secure the front cover with two self-tapping screws
(Fig. 52,
) from below with the longitudinal rails.
z
Slide the edges of the central boiler cover (Fig. 53,
[1]
) underneath the front boiler cover and insert into
the flange of the side panels.
z
Locate the edges and the notch for the boiler flow of
the rear boiler cover (Fig. 54,
[1]
) forward onto the
side panels.
Fig. 52 Installing the front cover
1
2
3
USER NOTE
Install the control unit, route the capillary
tubes to the sensor well and insert the
sensors into the well, before positioning
any other hood components
(
chapter 10 "Installing the control
Fig. 53 Installing the central cover
2
1
1
Fig. 54 Installing the rear cover
2
1
1