Boiler positioning
7
Logano GE515 - We reserve the right to make any changes due to technical modifications.
14
7
Boiler positioning
In this chapter you will learn how to correctly position the
Logano GE515.
7.1
Tools and accessories
The following tools and auxiliary materials are required
for the boiler assembly (the listed items must be
provided by the installer):
–
Boiler compression tool 2.2 (Fig. 4, page 15)
or 2.3 (Fig. 5, page 15)
–
Boiler installation template for fitting the boiler
sections together
–
Steel hammer and wooden or rubber mallet
–
Half-round bastard file
–
Screwdrivers (Philips and flat bladed)
–
Flat chisel
–
Spanner SW 13, 19, 24, 36 and Allen key SW 19
–
Support wedge, flat iron
–
Cleaning rags and cloth
–
Fine emery cloth
–
Wire brush
–
3-in-1 oil
–
Solvent (petrol or solution)
–
Spirit level, ruler, chalk, straight edge
–
Blanking flange with vent facility (for pressure test)
CAUTION!
SYSTEM DAMAGE
through frost.
z
Install the system in a room which has
been protected from frost.