ASSEMBLY INSTRUCTION
5
Complete assembly systems are delivered to the recipient with protection against damage. The
completeness of the delivery as well as appropriate condition of the delivered profiles shall be confirmed in
writing by the recipient on the Stock Issue Confirmation or on any other equivalent document, on which
comments regarding the product, provided there are any, should be written down
.
5. ASSEMBLY - GENERAL INFORMATION
The assembly is to be conducted in accordance with the instructions issued by Budmat.
Adapt the foundation of the structure to the local soil conditions.
Recommended tightening torques during the assembly:
M8 hexagon socket screws, mid and end clamps: 10-11 Nm
During the tightening of the screws to the module frame, the rhombic Magnelis nut may become deformed at the torque of 11 Nm.
This deformation is acceptable.
Screws and nuts: M10: 44-48 Nm (for tZn screws)
M12: 51-55 Nm (for A2-70 screws)
77-81 Nm (for tZn screws)
Tightening fasteners with impact drivers and/or wrenches is prohibited.
In order to prevent the fasteners from seizing, it is recommended to use a lubricant (eg. teflon grease) on
joints exposed to dust, water etc.
It is prohibited to interfere with the structure by drilling holes, grinding its edges, cutting it or carrying out other activities that
may damage its protective layer, unless such an activity is admissible as per the instruction or Budmat consents to such an activity being
carried out.
The upper parts of the posts may become deformed while driven into the ground. In that case, the
occurring deformations should be secured with zinc paint along the scratch. Remove any soiling from the
components that has accumulated during the assembly immediately before proceeding to the next assembly
phase.
a. Tools
Required tools