2002 Buell P3: Engine
3-17
HOME
10. See
Figure 3-28.
Install rear motor mount bolts.
a. Apply several drops of LOCTITE
®
THREAD-
LOCKER 262 (red) to last few threads.
b.
Tighten to 30-33 ft-lbs (41-45 Nm).
11. See
Figure 3-29.
Connect feed, return, transmission and
crankcase vent lines.
Figure 3-27. Hoisting Bike
Figure 3-28. Installing Rear Motor Mount Bolts
Figure 3-29. Connect Lines
7650
7623
7634
1.
Oil return
2.
Transmission vent
3.
Crankcase vent
4.
Feed
4
2
1
3
Summary of Contents for 2002 P3
Page 2: ......
Page 17: ...A 15 Appendix A Tools HOME ...
Page 32: ...C 3 Appendix C Metric Conversions HOME ...
Page 41: ...1 8 2002 Buell P3 Maintenance HOME NOTES ...
Page 75: ......
Page 111: ...2 36 2002 Buell P3 Chassis HOME NOTES ...
Page 143: ...2 68 2002 Buell P3 Chassis HOME NOTES ...
Page 144: ...2002 Buell P3 Chassis 2 69 HOME ...
Page 146: ......
Page 147: ......
Page 223: ...3 76 2002 Buell P3 Engine HOME NOTES ...
Page 225: ......
Page 256: ...2002 Buell P3 Fuel System 4 31 HOME ...
Page 258: ......
Page 259: ......
Page 279: ...5 20 2002 Buell P3 Electric Starter HOME NOTES ...
Page 281: ......
Page 327: ......
Page 398: ...2002 Buell P3 Electrical 7 71 HOME ...
Page 400: ...Product 1 2 ...