9
6.1 Before installation
Installation position:
The▶installation▶position▶is▶optional.▶Preferably:▶Actuator▶at▶the▶top.
▶
→
Prior▶to▶installation▶check▶pipelines▶for▶dirt▶and▶clean▶if▶necessary.
Dirt filter:
▶To▶ensure▶that▶the▶solenoid▶valve▶func-
tions▶reliably,▶a▶dirt▶filter▶(
≤
▶500▶µm)▶must▶be▶
installed▶in▶front▶of▶the▶valve▶input.
6.2 Installation
▶
→
Observe▶flow▶direction:▶▶
Functioning▶of▶the▶device▶is▶only▶ensured▶if▶the▶circuit▶function▶is▶
maintained.
Deviceswith socket connection
▶
→
Use▶PTFE▶tape▶as▶seal▶material.
▶
→
Determine▶the▶maximum▶screw-in▶depth▶of▶the▶connecting▶threads▶
as▶this▶does▶not▶comply▶with▶any▶standard.
NOTE!
Caution risk of breakage.
▶
▶
Do▶not▶use▶the▶coil▶as▶a▶lifting▶arm.
▶
→
Hold▶the▶device▶with▶a▶suitable▶tool▶(open-end▶wrench)▶on▶the▶
body;▶screw▶into▶the▶pipeline.
Attaching▶the▶device:
▶
→
Via▶bore▶holes▶M4x8▶(made▶from▶brass▶or▶stainless▶steel)▶or▶self-
tapping▶screws▶3.9▶DIN▶7970▶(made▶from▶plastic,▶max.▶screw-in▶
depth▶10▶mm)▶on▶the▶bottom▶side▶of▶the▶body▶at▶drill▶pattern▶
38x24.
Devices in flange model
Attaching▶the▶device:
▶
→
Via▶supplied▶screws▶on▶basic▶devices▶or▶manifold.
▶
→
Tighten▶fastening▶screws▶on▶the▶coil▶to▶a▶maximum▶torque▶of▶2▶Nm.
english