Installing the Server in the Rack Cabinet
Warning
The system can weigh up to 23.5 kg. If it contains numerous
optional boards and peripheral devices, it will weigh more. To
avoid personal injury, make sure you have at least one person
help you lift or move the system.
1.
Lift the server onto the support rails and slide it toward the rear of the cabinet.
2.
Assemble the M5x16 screws (
"Figure 65: M5x16 screws"
) and their assorted
washers (
"Figure 66: Washers"
) as shown in the figure below.
3.
Secure the server to the vertical mounting rails by inserting the screws prepared in
step 2 in the caged nuts located in the middle of the sixth U (A).
Figure 74: Securing the server to the rack cabinet
A
A
Summary of Contents for NovaScale R410 E1
Page 1: ...NovaScale T810 E1 T830 E1 R410 E1 User s Guide NOVASCALE REFERENCE 86 A1 15FA 00 ...
Page 2: ......
Page 34: ...User Guide 34 www bull com Motherboard Motherboard Layout Figure 14 Motherboard Layout ...
Page 53: ...User Guide 53 www bull com SAS Hard Disk Drive Capacity 73GB minimum 15000 RPM RAID support ...
Page 318: ......
Page 319: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 15FA 00 ...