User Guide
79
www.bull.com
7.
Install the server chassis into the rack.
a.
Align the inner rails (attached to the server chassis) with the outer rail
assemblies (attached to the rack). See letter “A”.
Note: The inner slides must be positioned all the way
forward in the rails to ensure proper installation of the server.
b.
Engage the matching rails and slide the server chassis into the rack
(letter “B”
) until the two safety stops lock into position (letter “C”).
Figure 42: Installing the Server Chassis into the Rack (step 1)
A: Front of the rack
Summary of Contents for NovaScale R410 E1
Page 1: ...NovaScale T810 E1 T830 E1 R410 E1 User s Guide NOVASCALE REFERENCE 86 A1 15FA 00 ...
Page 2: ......
Page 34: ...User Guide 34 www bull com Motherboard Motherboard Layout Figure 14 Motherboard Layout ...
Page 53: ...User Guide 53 www bull com SAS Hard Disk Drive Capacity 73GB minimum 15000 RPM RAID support ...
Page 318: ......
Page 319: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 15FA 00 ...