background image

Page 4

ELECTRICAL REQUIREMENTS

CAUTION - 

The brewer must be disconnected from the power source until specified in 

Initial Set-Up.

ELECTRICAL INSTALLATION INSTRUCTIONS
CAUTION –

Improper electrical installation will damage electronic components.

1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Before electrically connecting the brewer, remove the front cupola cover and rotate the thermostat knob fully

counterclockwise to the "OFF" position. Keep this knob in the "OFF" position until performing the 

Initial Setup.

4. Electrical service is connected at the upper rear of the brewer using a junction box.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.   Replace

all panels.

6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source.  If plumbing

has been hooked up, the brewer is ready for 

Initial Setup.

NOTE:  A schematic wiring diagram is included in this manual.

PLUMBING REQUIREMENTS

The brewer must be connected to a cold water system with operating pressure between 20 and 90 psi  (138

and 620 kPa) from a 1/2" or larger supply line.  A shut-off valve should be installed in the line before the brewer.
Install a regulator in the line when pressure is greater than 90 psi (620 kPa)  to reduce it to 50 psi (345 kPa).  The
water inlet fitting is 3/8" flare.

NOTE - 

Bunn-O-Matic recommends 3/8" copper tubing for installations  from the 1/2" water supply line.  Bunn-O-

Matic does not recommend the use of a saddle valve to install the brewer.  The size and shape of the hole made
in the supply line by this type of device may restrict water flow.

PLUMBING HOOK-UP

1. Make certain the 3/8" female flare fittings on the tube (supplied) are securely attached to the strainer outlet and

male fitting at the rear of the brewer.

2. Flush water line and securely attach it to the 3/8" male flare on the inlet of the strainer.

Requires 2-wire, gorunded service rated 230 volts

ac, 32 Amps, single phase, 50 Hz.

FACTORY WIRED

P2226

This equipment must be installed to comply with the Basic Plumbing Code of the Building
Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation
Manual of the Food and Drug Administration (FDA).

Requires 4-wire, 3-phase grounded service rated

400 volts ac, 15 amp, 3 phase, 50 Hz.

FIELD WIRING

10060.3  070102

Summary of Contents for U3A

Page 1: ...NG SERVICE MANUAL BUNN O MATIC CORPORATION POST OFFICE BOX 3227 SPRINGFIELD ILLINOIS 62708 3227 PHONE 217 529 6601 FAX 217 529 6644 www bunnomatic com U3A BUNN 10060 0003A 07 02 2002 Bunn O Matic Corp...

Page 2: ...ted by BUNN shipping the defective equipment prepaid to an authorized BUNN service location and 3 receiving prior authorization from BUNN that the defective equipment is under warranty THE FOREGOING W...

Page 3: ...ewer and in this manual They were written for your protection All notices on the brewer are to be kept in good condition Replace any unreadable or damaged labels 00878 0000 12593 0000 03408 0000 03409...

Page 4: ...cold water system with operating pressure between 20 and 90 psi 138 and 620 kPa from a 1 2 or larger supply line A shut off valve should be installed in the line before the brewer Install a regulator...

Page 5: ...nect the brewer to the power source and wait for the water in the tank to heat to the proper temperature This will take approximately 1 2 hours depending on the incoming water temperature Some water w...

Page 6: ...the water stream from the swing arm Release the switch Failure to release the switch within two seconds after the third break in the water stream causes the volume setting to be aborted and previous v...

Page 7: ...damp cloth 2 Drain both coffee reservoirs by opening coffee faucets When empty close faucets 3 Cycle two or three inches of water into each coffee reservoir adding a bucket of crushed ice to obtain a...

Page 8: ...airofelectricalequipmentshouldbeperformedonlybyqualifiedservicepersonnel All electronic components have 230 volt ac and low voltage dc potential on their terminals Shorting of terminals or the applica...

Page 9: ...ng procedures See page 20 Refer to Service Solenoid Valve for testing procedures See page 22 A Direction of flow arrow must be pointing towards brewer B Remove the strainer and check for obstructions...

Page 10: ...r must be level and installed on a sturdy structure Refer to Service Solenoid Valve for testing procedures See page 22 Refer to Service Liquid Level Board for testing procedures See page 17 Refer to S...

Page 11: ...rtoService Timerfortesting procedures See page 26 or 28 Refer to Service Start Switch for testing procedures See page 23 RefertoService Timerfortesting procedures See page 26 or 28 Refer to Service So...

Page 12: ...to Service Timer for test ing procedures See page 26 or 28 Checkpumpflowratewithawatch Pumpflowrateshouldbeapproxi mately 24 ounces in 15 seconds Be sure pump assembly is free of any obstructions Plum...

Page 13: ...tthebrewerfromthepower source before the removal of any panel or the replace ment of any component All components are accessible by the removal of the swing spout front cupola cover rear cupola cover...

Page 14: ...ce If voltage is present as described proceed to 9 If voltage is not present as described refer to the wiring diagrams and check the brewer wiring harness 9 Check for continuity across the terminals o...

Page 15: ...hermostat Removal and Replacement 1 Disconnect the wires from the control thermostat 2 Remove the thermostat capillary bulb by firmly pullinguponthecapillaryatthecomponentbracket This will disengage t...

Page 16: ...178 60 RED from ON OFF Switch P2112 RED from Main Harness FUSE AND FUSE HOLDER Removal and Replacement Fuse 1 Remove the cap from the fuse holder 2 Remove fuse from the fuse holder inspect if blown di...

Page 17: ...EVEL BOARD AND LEVEL PROBE P2178 55 Location The liquid level board is located on the left rear of the component bracket The level probe is located on the right rear of the component bracket Test Proc...

Page 18: ...by touching the end of the probe to any metal surace of the brewer Measure the voltage be tween T1 and T3 on the liquid level board The voltage should be 0 volts with the probe touching the frame and...

Page 19: ...agram and check the brewer wiring harness 5 Disconnect all wires on the ON OFF switch 6 Check for continuity across the center terminal 2 andthelowerterminal 1 whentheswitchisinthe ON upper position C...

Page 20: ...pump does not run replace the pump If voltage is not present as described refer to the wiring diagram and check the brewer wiring harness Removal and Replacement Refer to Fig 15 1 Disconnect the wire...

Page 21: ...must not present when the switch is in the OPEN right full position If continuity is present as described the switch is operating properly If continuity is not present as described replace the switch...

Page 22: ...ribed reconnect the wires to the solenoid If continuity is not present as described replace the solenoid valve 7 Check the solenoid valve for coil action Connect thedispensertothepowersource Listencar...

Page 23: ...when the switch is in the upper position If continuity is present as described reconnect the wires the switch is operating properly If continuity is not present as described replace the switch BLU to...

Page 24: ...operating properly If continuity is not present as described replace the switch Removal and Replacement NOTE Measurethedistancefromthetopoftheswitch plunger to the hood cover The same distance is nee...

Page 25: ...he brewer from the power source 2 Disconnect the wires from each tank heater 3 Check for continuity across the terminals of each tank heater If continuity is present as described tank heaters are oper...

Page 26: ...he component bracket Test Procedures 1 Disconnect the brewer from the power source 2 Disconnectthepolarized threepinconnectorfrom the brewer main harness and rotate the brew timer dial fully countercl...

Page 27: ...uired If voltage is not present as described replace the timer Removal and Replacement 1 Separate all connectors between the brewer wir ing harness and the timer 2 Disconnect the timer leads from the...

Page 28: ...scribed disconnect the brewer from the power source and replace the timer 7 With a voltmeter check the voltage across termi nals TL1 and TL4 when the ON OFF switch is in the ON position Connectthebrew...

Page 29: ...stream from the swing arm Release the switch Failure to release the switch within two seconds after the third break in the water stream causes the volume setting to be aborted and previous volume sett...

Page 30: ...Page 30 10493 0004A 07 02 2002 BUNN O MATIC CORPORATION 10060 3 070102...

Reviews: