background image

QUICK REFERENCE GUIDE FOR OPERATION AND MAINTENANCE 

MODEL:

BUNN ULTRA 2

EQUIPMENT SETUP GUIDE

•  Unbox Bunn Ultra2 and place on counter top. 

•  Ensure 6” of space around machine for ventilation. 

•  Plug into dedicated 110v circuit. 

•  Do not use an extension cord. 

(See “Initial Setup” of the BUNN Installation & Operating Guide)

1

2

3

4

Rinse and sanitize hoppers and hopper components prior to filling with product. 

(See Steps 11 - 13 of the “Disassembly & Cleaning” section of the “USE & CARE INSTRUCTIONS FOR ULTRA 1 & 2 COLD DRINK DISPENSER)

 

Follow the provided “ASSEMBLY” section of the “USE & CARE INSTRUCTIONS FOR ULTRA 

1 & 2 COLD DRINK DISPENSER” to complete the dispenser installation.

Add 5 parts water 1 one part concentrate to mixing jug. 

Shake and pour into Hopper (s).

Power on Bunn Ultra. Press Auger button to activate auger. Press temperature button and set to “ICE” 

Read and follow the BUNN ULTRA Installation & Operating Guide included with your kit. 

This Equipment Setup Guide is not intended to replace any manufacturer’s process or procedure.

POWER

AUGER

TEMPERATURE

The ICEE Company, Ontario, CA 91761   

92801932_SP_IQRG_BUNN

CUSTOMER SERVICE: 1-800-423-3872

For more Setup help, click or go to:

http://slushpuppie.com/store/kit-setup/

Reviews: