72
Viii
. Electrical
(continued)
Figure 47B: Multiple Boiler W
iring Diagram w/T
ekmar 264 Control
Tekmar 264 Based Control System (or equal)
Sequence of Operation
The
Tekmar 264 Control (or equal) can control up to four (4) boilers and an Indirect W
ater Heater by utilizing stage firing. When a call for heat is received by the
Tekmar 264
Control, the control will fire either one or more boilers in sequential firing mode to establish a required reset water temperature in the system supply main based on outdoor temperature.
The boilers will modulate on their own based on each boiler
’s Sage2.1™ Control and will target a setpoint temperature to supply enough input to the system main
to satisfy the desired reset water temperature in the main established by the
Tekmar 264 Control. When a call for Indirect Hot W
ater is generated to the
Tekmar 264, the control
will de-energize the zone pump control (ZC terminal), energize the Indirect pump and sequentially fire the boilers to establish a setpoint temperature in the main for the Indirect Heater using Priority
.
The
Tekmar 264 Control will disable the stage firing and post purge the Indirect Pump to reduce the temperature in the Supply Main near the end of the
Indirect Mode to a point where it will need to be when it changes back to Space Heating Mode.
The
Tekmar 264 Control also has the ability to rotate the lead-lag firing of the
boilers to establish equal operating time for each boiler stage.
Summary of Contents for Apex APX399
Page 65: ...65 VIII Electrical continued Figure 43 Ladder Diagram ...
Page 66: ...66 VIII Electrical continued ...
Page 67: ...67 Figure 44 Wiring Connections Diagram VIII Electrical continued ...
Page 110: ...110 1P 3 1P 2 1P 1 XIII Repair Parts continued 1C 1D 1E ...
Page 116: ...116 XIII Repair Parts continued ...
Page 118: ...118 XIII Repair Parts continued ...
Page 129: ...129 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 130: ...130 SERVICE RECORD DATE SERVICE PERFORMED ...