X. Operation
G. Changing Adjustable Parameters (continued)
Parameter Selections:
System Pump= “Central Heat ,
Optional Priority”
Boiler Pump = “any demand”
DHW Pump = “Primary Loop Piped IWH”
DHW Priority Enable is optional
Explanation:
This piping arrangement permits the
system pump to run or not run when
there is a domestic hot water call for heat.
Domestic hot water priority is optional.
It is permissible for the domestic and
system pumps to run at the same time.
The boiler pump must run for every call
for heat.
Example Pump Parameter selections
(continued):
Single boiler Indirect Water Heater Piped to Primary, Optional Domestic Hot Water Priority.
Multiple Boilers with Boiler Piped IWH, System and DHW Wired to Master
Sequencer Master
(Boiler 1)
Boiler 2
Wiring locations:
Thermostat
X
DHW call for heat
X
System pump
X
DHW pump
X
Boiler Pump
X
X
Sequencer Master Parameter Selections:
Sequencer Master
Enabled
Indirect Water
Heater
“Boiler Piped”
Pump Parameter Selections:
System Pump =
Central Heat,
No Priority
Never
Boiler Pump =
Central Heat,
Off DHW Priority
Any
demand
DHW Pump =
Boiler Piped IWH
Never
Explanation:
This piping arrangement does not allow both the Slave 1’s boiler and domestic hot water pump to run at the same time.
When call for Domestic Hot Water is received the DHW pump is turned on and the boiler pump is turned off. However, the
system pumps may run to satisfy a central heat demand that is being satisfied by a different slave. The central heat demand
is ignored by Slave 1 until the domestic hot water demand is ended. If domestic hot water priority is enabled and priority
protection time is exceeded the domestic hot water pump turns off to allow the boiler pump to run.
Summary of Contents for Apex APX399
Page 65: ...65 VIII Electrical continued Figure 43 Ladder Diagram ...
Page 66: ...66 VIII Electrical continued ...
Page 67: ...67 Figure 44 Wiring Connections Diagram VIII Electrical continued ...
Page 110: ...110 1P 3 1P 2 1P 1 XIII Repair Parts continued 1C 1D 1E ...
Page 116: ...116 XIII Repair Parts continued ...
Page 118: ...118 XIII Repair Parts continued ...
Page 129: ...129 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 130: ...130 SERVICE RECORD DATE SERVICE PERFORMED ...