41
7) Start the boiler using the lighting instructions on page 40. After the boiler is powered up, it should go through
the following sequence.
Sequence Display
Meaning
1
U.125
or Blank
Checking internal software (power-up only)
2
0.SWT
Boiler in standby.
SWT
= Supply Water Temp. No call for heat.
(After call for heat from heating thermostat)
3
A.SWT
Self-Check on Start-up
4
5.SWT
Blower and circulator on. Checking for adequate air flow.
5
1.SWT
Prepurge
6
2.SWT
Trial for ignition
7
3.SWT
Flame established. Boiler responding to a call for heat.
8) Upon initial start-up, the gas train will be filled with air. Even if the gas line has been completely purged of air,
it may take several tries for ignition before a flame is established. If more than 5 tries for ignition are needed,
it will be necessary to press the reset button to restart the boiler. Once a flame has been established for the first
time, subsequent calls for burner operation should result in a flame on the first try.
9) Inspect the flame visible through the window. On high fire the flame should be stable and mostly blue
(Fig.10.1). No yellow tipping should be present; however, intermittent flecks of yellow and orange in the flame
are normal.
10) Check the inlet pressure and adjust if necessary. Verify that the inlet pressure is between the upper and lower
limits shown on the rating plate with all gas appliances on and off.
Figure 10.1: CHG Burner Flame
warNINg
ThE COrrECT OuTlET PrEssurE fOr ThE gas ValVE has bEEN
faCTOry sET aND rEquIrEs NO fIElD aDJusTmENT. ThIs sETTINg Is
saTIsfaCTOry fOr bOTh NaTural gas aND PrOPaNE. aTTEmPTINg TO
aDJusT ThE OuTlET PrEssurE may rEsulT IN DamagE TO ThE gas
VALVE AND CAuSE PRoPERTy DAMAGE, PERSoNAL INjuRy oR LoSS oF
lIfE.
Summary of Contents for CHG CHG150
Page 25: ...25 Figure 8 3 Piping Method 1 Heat Indirect Water Heater Figure 8 2 Piping Method 1 Heat Only ...
Page 29: ...29 Figure 8 8 Piping Method 2 Heat Only Figure 8 9 Piping Method 2 Heat Indirect Water Heater ...
Page 36: ...36 Figure 9 1 Wiring Connections Diagram ...
Page 37: ...37 Figure 9 2 Ladder Diagram ...
Page 38: ...38 Figure 9 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Page 40: ...40 CHG Series Lighting and Operating Instructions ...
Page 46: ...46 Figure 11 2 Basic Menu Tree ...
Page 54: ...54 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 58: ...58 ...
Page 59: ...59 ...
Page 60: ...60 ...
Page 61: ...61 ...
Page 63: ...63 ...
Page 65: ...65 ...
Page 66: ...66 ...
Page 67: ...67 ...
Page 69: ...69 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 70: ...70 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 71: ...71 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 72: ...9EARS IN 3ERVICE 3ERVICE HARGE AS OF 2ETAIL 0RICE O HARGE ...