13
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
5. DELIVERY OF THE BOILER
• Inspect the integrity of the packaging
upon delivery.
• Check whether all components
have been delivered to you. Boiler
consignment package includes:
1) Pellet boiler PelleBurn with pellet
burner Pell
2) Auger
3) Fuel hopper FH 500-V2 (option)
4) Safety valve 3 bar.
5) Fire irons
6) Technical passport. Installation and
operation manual
7) Service booklet and Warranty card
If any of the above items are missing,
contact your supplier.
6. INSTALLATION OF THE HEATING
BOILER
The assembly, installation and
set-up of the boiler must be
performed by a technician
authorized for such operations.
Installer must indicate to the user
of the installation the minimum
clearances from flammable
materials and liquids.
Requirements:
- Boiler room must be frost-proof;
- Boiler room must allow for continuous
access of air necessary to maintain
combustion;
- Boilers must not be placed in inhabitable
rooms;
- All boiler rooms must have correctly
calculated vent depending on the boiler
output. The vent must be protected by
means of a net or grate.
The size of the vent is calculated
according to the formula:
А=6,02Q
- where:
А
– area of the vent in cm
2
,
Q
– boiler output in kW
- Remove the packaging without polluting
the environment
- Observe
building
supervision
instructions, in particular the existing
Ordinance on combustion devices and
storage of combustion materials, on
building requirements applicable to
installation sites and on ventilation;
- The boiler must be placed on a
foundation whose surface area is larger
than the base of the heating boiler
according to diagram 1;
- The boiler must be placed in a position
which allows for the easiest possible
cleaning and servicing;
- Installation must be carried out
according to installation diagram 1
which shows the boiler housing;
- No objects made of flammable materials
or liquids may be placed on/near the
boiler;