18
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
7.5. Pellet burner connection to the fuel
hopper and pellet auger
Take the feeder chute flexible hose (from
the auger set). Using a bracket, clamp
one end of the hose onto the motor-end
outlet of the pellet auger.
- Remember – pellet auger must be
installed at 45° angle to the ground
horizontal surface.
- Fill the hopper with fuel (see table 2 for
parameters of the fuel types used)
- Plug the power cord of the pellet auger
into the indicated Schuko-type burner
socket on the left side of the burner
housing.
Diagram 10. Mounting the pellet burner Pell
to WBS Active boiler
1.
WBS Active boiler;
2.
Pellet burner Pell;
3.
Auger flexible pipe;
4.
Auger;
5.
Fuel hopper.
7.6. Connecting the pellet burner to the
mains power supply
Such connection must be
performed by a technician /
service shop authorized for such
operations.
Caution! ELECTRIC SHOCK
HAZARD!
-
Before opening the unit: switch
off the voltage and secure the
unit against accidental restart.
-
Observe installation instructions.
It is mandatory to assure a
backup power generator of
corresponding rated power! (see
13.2)
Improper cable connections may
damage the regulator!
The device may be damaged if
struck by a lightning. Make sure
it is unplugged during the storms.
It is imperative that the
installation of the sensor to
control the temperature in the
boiler. View a scheme 5 point 6.
ATTENTION! STB - thermostat
(located on the front panel of the
boiler) to be bound to the burner
according to wiring diagram 12.
The boiler must be connected to a
220V/50Hz mains using power plug (3
meters long, bound to the burner).
Create tight connection with the electrical
mains which complies with the local
regulations.