Installation Process
(inc. 12V Water Pump)
Before use, it is important to prepare the unit by installing the proper components.
In this example, we will be preparing the portable water heater to be used with a
water input from the supplied 12-volt pump.
1.
Remove the heater and components
from the box. Identify the gas input, hot
water output, cold water input as well
as a battery box, on the bottom of the
heater.
3.
Locate the Gas Hose and Regulator.
insert the black rubber washer as shown
into the brass fitting.
Insert black rubber washer
WARNING
DO NOT USE TEFLON TAPE on the gas
or water fittings. The unit has been designed to
be assembled with the use of rubber washers.
2.
Insert two ‘D’ batteries into the
‘battery box’ and close the battery box
lid. Note: The orientation of the battery
terminals.
4.
Fit and tighten the hose fitting with
an open ended 24mm spanner, taking
care not to over tighten as this could
break or crack the inlet pipe. The gas
input/bottle is now ready to be connected.
| Gas Hot Water Shower
Page 9
Summary of Contents for CSG010
Page 1: ...CSG010 ...